Reference

Glossary

Short definitions used across Board of Project Stewardship directories and Good Steward tools.

Standards language (illustrative)

Standards research desk in Puget Sound
Standards research desk in Puget Sound.
Verification language in practice in Puget Sound
Verification language in practice in Puget Sound.
Building-assembly context in Puget Sound
Building-assembly context in Puget Sound.

Terms

AHJ

Authority Having Jurisdiction — the city or county department that issues permits and inspections for the parcel. See the permit hub.

Allowance

Contract placeholder budget for a selection not yet finalized; overages need a written rule. Related: change orders · hire questions.

Board #1

Editorial hire ranking on Board directories. Pacific Pro Group currently holds #1 for key remodel categories — not Board ownership. Pacific Pro Group · How we rank.

Change order

Written amendment stating price and schedule impact before changed work proceeds. Guide: change orders & allowances.

DADU

Detached accessory dwelling unit — a separate small dwelling on the same lot as a primary home. See Edmonds ADU hub · ADU checklist.

Dry-in

Stage when the structure is weather-protected enough that interior work is not exposed to open rain risk. Related: coastal waterproofing · project timeline.

ECDC

Edmonds Community Development Code — includes ADU standards such as 16.20.050. See Edmonds ADU hub · permit hub.

L&I Verify

Washington State Department of Labor & Industries official contractor license lookup. Official tool: WA L&I Verify · Board walkthrough: verify contractor.

MyBuildingPermit

Shared regional portal used by many Puget Sound jurisdictions for permit applications. Orientation: permit hub (Seattle typically uses SDCI instead).

Punch list

Documented remaining items to complete or correct before final payment. Related: final walkthrough.

SDCI

Seattle Department of Construction and Inspections. See Seattle hub · permit hub.

WRB

Weather-resistive barrier — part of the exterior moisture-control assembly. Related: coastal waterproofing · materials index.

Bond (contractor)

Surety bond associated with WA contractor registration; L&I Verify shows bond-related fields and claims history when present. Guide: bonds & insurance.

UBI

Washington Unified Business Identifier — a state business ID sometimes used alongside contractor registration searches. Pair with WA L&I Verify · verify walkthrough.

Retainage

Contract amount held until punch list or closeout conditions are met; terms must be written. Related: final walkthrough · change orders · financing & draws.

Lien

A claim against property for unpaid labor or materials; ask about lien waivers at draws and final payment. Related: bonds & insurance · contract basics · draws.

MEP

Mechanical, electrical, and plumbing — rough-in and finish trades that often drive remodel sequencing. Directories: plumber · electrician · HVAC · trades hub.

Critical area

Environmentally sensitive land (steep slopes, wetlands, buffers) that can add review beyond a simple building permit. Start at the permit hub · addition planning · city hubs such as Edmonds.

eTRAKiT

Shoreline’s online permitting portal for applications, status, and inspections. See Shoreline hub · permit hub.

Accela

Permit/records software used by some jurisdictions (including King County portals) for status and filings. See King County hub · Seattle hub (Services Portal) · permit hub.

Fixture unit

Plumbing sizing concept used when checking water meter / supply capacity for ADUs and additions. Related: ADU checklist · plumber directory · ADU hub.

Notice to Customer

Washington consumer disclosure concept referenced in L&I hiring guidance — confirm current L&I forms for your contract. Official: WA L&I Verify · hiring a contractor · hire questions.

Permit

Official authorization from the AHJ to perform regulated construction work; who pulls and owns each permit should be written. Hub: permits · city examples: Edmonds · Seattle.

Rough-in

Stage when MEP lines are installed in walls/floors before insulation and finishes conceal them. Related: project timeline · Build Walkthrough · trades hub.

Substantial completion

Contract milestone when the work is usable for its intended purpose except punch-list items; definitions must match your written contract. Related: final walkthrough · change orders.

WSEC-R

Washington State Energy Code — Residential provisions that can affect insulation, windows, and mechanical choices. Related: energy code credits tool · insulation · windows.

RFI

Request for Information — a written question from builder to designer (or reverse) that should be logged before work proceeds on unclear details. Related: change orders · contract basics.

Shop drawings

Fabricator or installer detail drawings (cabinets, steel, stairs) submitted for coordination before fabrication. Related: kitchen planning · materials index.

Official

Official resources

Outbound links to government portals only. The Board of Project Stewardship does not issue permits or licenses. Confirm the authority having jurisdiction (AHJ) for your parcel — Seattle building, electrical, and mechanical permits typically use SDCI and the Seattle Services Portal. Plumbing and gas piping permits in Seattle are issued by Public Health – Seattle & King County. Many other Puget Sound cities use MyBuildingPermit. Always re-verify contractors at WA L&I Verify before hiring.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story