STAMP OF TRUST INTEGRITY SHIELD BOARD OF PROJECT STEWARDSHIP

Six-layer review framework

Technical Bulletin · Pacific Northwest

Board credential

Stamp of Trust

Integrity Shield verification for residential construction

An independent standards mark for contractors serving King County, Snohomish County, Seattle, Edmonds, and neighboring Pacific Northwest communities. Not a government license, permit, warranty, or paid placement — a forensic stewardship screen.

Stewardship field context (illustrative)

Illustrative: Washington L&I contractor license record prepared for verification — not a real Board job photo
License lookup is separate from the Stamp
Illustrative: permit drawings and jurisdiction documents on a review table — not a real Board job photo
Permit ownership stays with the project
Illustrative: finished Pacific Northwest remodel used as quality context — not a real Board job photo
Finished work is context, not a warranty

Purpose

What the Stamp means

One mark, two audiences — clarity for homeowners and a public standard for firms that choose stewardship over marketing shortcuts.

For homeowners

A filter, not an ad

The Stamp of Trust signals that a contractor was reviewed against the Board’s Integrity Shield — financial, technical, accountability, local, license, and permit-ownership expectations. Always re-check Washington L&I status before you hire.

For contractors

Authority you earn

The Board does not sell placement. Firms that complete the application checklist and clear the six Integrity Shield layers may display the Official Stamp of Trust on their site and project materials while status remains current.

Integrity Shield

Six layers of project stewardship

The Stamp of Trust rests on the Integrity Shield — six educational and editorial layers the Board of Project Stewardship uses to organize due diligence. Checkable signals, not a single marketing claim.

1

Financial Solvency

Licensing alone is not enough. The Board reviews bonding capacity against active project loads. Over-leveraged firms do not receive the Stamp of Trust — reducing homeowner exposure to liens and abandoned jobsites.

2

Technical Review / McMorrough Protocol

Portfolios are reviewed against architecture and construction reference standards using the McMorrough Protocol — an editorial lens for drawings, detailing, and completed work. Not a professional license or certification.

3

Project Steward

Every verified engagement expects a designated Project Steward — a single point of accountability who champions the homeowner’s vision against scope creep and budget drift. No salesman handoffs.

4

Local Mastery

Competence where the work happens: King County, Snohomish County, Seattle, Edmonds, and neighboring jurisdictions — including permitting paths, height limits, view corridors, and critical-area rules where they apply.

5

WA L&I License

Preference for firms with active Washington contractor registration. Homeowners should re-verify status at the official L&I Verify portal before hiring. The Board is not L&I.

6

Permit ownership

Clear answers on who pulls and owns each permit, who schedules inspections, and who closes corrections before cover-up. The Board of Project Stewardship does not issue permits.

Credential process

How to earn the Stamp of Trust

A multi-step path for contractors operating in the Pacific Northwest who want to signal Board-reviewed stewardship — not a one-click badge purchase.

Step 1

Prepare your file

Gather UBI, L&I contractor ID, insurance certificates, and three Seismic Category D framing case studies. Confirm a named Project Steward for active work.

Step 3

Integrity Shield review

Editorial review across all six Integrity Shield layers, including technical review under the McMorrough Protocol and local jurisdictional evidence.

Step 4

Decision & badge grant

If approved, you receive permission to display the Official Stamp of Trust embed while your status remains current. Status can be withdrawn if records lapse.

Application requirements

Application checklist

Core package requirements drawn from the Board’s published Stamp of Trust criteria. Integrity Shield layers 5–6 reinforce license and permit-ownership expectations.

Official checklist · Board of Project Stewardship

  • Active UBI & L&I Contractor ID

    Submit current Washington business and contractor registration identifiers for verification against public records.

  • Three Seismic Category D framing case studies

    Provide documentation demonstrating Seismic Category D framing competence on completed or permitted projects.

  • General Liability Insurance — $2M minimum

    Proof of active GL coverage at or above the $2M minimum stated in Board Stamp criteria.

  • Stewardship Code of Ethics (transparency)

    Written agreement to the Stewardship Code of Ethics regarding transparency with homeowners and the Board.

  • WA L&I standing (Integrity Shield layer 5)

    Maintain active Washington contractor registration; homeowners will be directed to re-verify at L&I Verify.

  • Permit ownership clarity (Integrity Shield layer 6)

    Be prepared to state who pulls and owns permits, schedules inspections, and closes corrections on Board-reviewed work.

Questions or submissions: editorial@boardofprojectstewardship.com

Display your status

Use the credential with a live source link

Verified contractors may embed the Official Stamp of Trust on their website. Keep the link live so homeowners can confirm the Board page.

Badge preview

How the embed appears on a light contractor site.

The badge is descriptive. It does not claim government approval or guarantee project performance.

Embed code
<a href="https://boardofprojectstewardship.com/stamp-of-trust/" target="_blank" rel="noopener" style="text-decoration:none;">
  <div style="display:inline-flex;align-items:center;gap:12px;background:#022c22;padding:10px 18px;border-radius:50px;border:1px solid #d4af37;font-family:sans-serif;">
    <span style="color:#fbbf24;font-weight:900;margin-right:4px;">✓</span>
    <span style="display:flex;flex-direction:column;line-height:1.15;">
      <span style="color:#94a3b8;font-size:9px;font-weight:700;letter-spacing:1.5px;text-transform:uppercase;">Verified by</span>
      <span style="color:#ffffff;font-size:11px;font-weight:800;">Board of Project Stewardship</span>
    </span>
  </div>
</a>

Installation

Embed steps

Step 1

Copy the code

Use the Copy Code button above to place the Stamp of Trust snippet on your clipboard.

Step 2

Paste on your site

Add the snippet to your footer, About page, or project landing templates where homeowners look for credentials.

Step 3

Keep the link live

Do not strip the href. The badge must continue to open the Board Stamp of Trust page so status remains checkable.

FAQ

Common questions

Is the Stamp of Trust a government license?

No. It is an independent editorial credential from the Board of Project Stewardship. Washington contractor registration is issued by L&I — always verify there.

Does the Board perform construction?

No. The Board publishes construction standards and contractor directories. It does not perform construction under the Board name and does not sell contractor leads.

What is the Integrity Shield?

Six stewardship layers: Financial Solvency; Technical Review / McMorrough Protocol; Project Steward; Local Mastery; WA L&I License; and Permit ownership.

Who owns the building permits?

That must be explicit in your contract. The Board expects clear permit ownership and inspection accountability; the Board itself does not issue permits.

How do I re-verify a contractor’s L&I status?

Use Washington Labor & Industries’ public contractor verification service at secure.lni.wa.gov/verify/. Because registration status can change, check it directly when making hiring decisions.

Can anyone buy placement on this page?

No. The Stamp is awarded after review against Board criteria. Placement is not sold as advertising inventory on this credential page.