Board of Project Stewardship · Bellevue · Eastside · King County

Bellevue remodels — city permits, Eastside houses, clear GC hire

Bellevue kitchens and baths remodel under Bellevue Development Services — paperless through MyBuildingPermit — not Seattle SDCI. This Board of Project Stewardship hub separates finish swaps from work that trips LUC 20.25H steep-slope setbacks or Shoreline Overlay 20.25E on Lake Washington, Lake Sammamish, Phantom Lake, or lower Kelsey Creek. Educational only — not a bid or a schedule.

Field context · Bellevue (illustrative)

Bellevue residential exterior remodel context
Bellevue residential exterior remodel context.
Kitchen remodel interior for Bellevue homeowners — PNW materials
Kitchen remodel interior for Bellevue homeowners — PNW materials.
Bathroom remodel scene for Bellevue — waterproofing-minded PNW context
Bathroom remodel scene for Bellevue — waterproofing-minded PNW context.

General process video (not specific to Bellevue)

Educational construction process video for Bellevue planning context — not a Board project walkthrough or guarantee.

Who permits work in Bellevue?

Bellevue Development Services is the AHJ. Building and many land-use filings go through MyBuildingPermit. Mapped landslide or steep-slope parcels can require a Critical Areas Land Use Permit and preapplication under LUC 20.25H; shoreline parcels may also need Shoreline Overlay review. Confirm the live portal for your address — do not assume Seattle SDCI.

Full permit jurisdiction hub · Verify contractor · Learn hub

Kitchen remodels under Bellevue’s permit path

Bellevue kitchens remodel under a city permit path, not Seattle’s. Layout and finish work can stay light; wall, plumbing, or electrical moves usually need Bellevue Development Services review via MyBuildingPermit. On steep-slope or shoreline-adjacent lots, geotech and critical-areas packets can shape the sequence before cabinets go in. Educational — not a price list.

Kitchen remodelers directory · Kitchen remodel planning

Bathroom remodels in Bellevue’s Eastside houses

Eastside houses in Bellevue often have more room than a tight Seattle lot — but waterproofing and ventilation still make or break the bath. Gut vs refresh is a scoped choice; plumbing moves follow city review. Shoreline or critical-areas overlays can add land-use steps even when the wet room itself looks routine.

Bathroom remodelers directory · Bathroom waterproofing guide

Bellevue home additions — ground floor or up

On many Bellevue lots the first fork is ground bump-out versus second story — different load paths, weather-in, and setback questions. Steep-slope toe setbacks under LUC 20.25H and shoreline buffers on Lake Washington or Lake Sammamish can decide what fits before a GC prices framing. Treat the choice as scoped diligence, not a Board yield promise.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Bellevue.

Official

Official portals · Bellevue

Live authority-having-jurisdiction (AHJ) links for Bellevue. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Bellevue hub FAQ

Is this a complete contractor list for Bellevue?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Bellevue. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Bellevue?

Bellevue Development Services is the AHJ. Building and many land-use filings go through MyBuildingPermit. Mapped landslide or steep-slope parcels can require a Critical Areas Land Use Permit and preapplication under LUC 20.25H; shoreline parcels may also need Shoreline Overlay review. Confirm the live portal for your address — do not assume Seattle SDCI.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Bellevue permitted through Seattle SDCI?

No. Bellevue parcels use Bellevue Development Services (often via MyBuildingPermit). Confirm the live AHJ for your address before design freeze.

Do Eastside Bellevue lots always allow a ground addition?

No. LUC 20.25H steep-slope setbacks, shoreline overlays, and existing structure still control what fits. Treat bump-out vs second story as a scoped choice with a licensed GC — the Board does not invent lot yields.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story