King County

Shoreline lowers window requirements for new homes and townhouses

A Shoreline development code update that took effect Oct. 13 cuts the share of a street-facing wall that must be windows or doors, lets parking edge into rear setbacks and gives subdivisions more time while construction permits are active.

Shoreline City Hall on Midvale Avenue North in Shoreline, Washington, where the City Council adopted the development code
Shoreline City Hall on Midvale Avenue North in Shoreline, Washington, where the City Council adopted the development code update that lowers window requirements. ECTran71 / Wikimedia Commons, CC0 1.0 (https://creativecommons.org/publicdomain/zero/1.0/)

Key Takeaways

  • Shoreline's City Council adopted Ordinance 1072 on Oct. 5. The development code update took effect Oct. 13.
  • New homes in Shoreline's Neighborhood Residential zones now need windows and doors on at least 20% of the street-facing wall with the main entry, down from 30%. Other street-facing walls need 10%, down from 15%. The city's townhouse design standards get the same 20% and 10% minimums.
  • The update also lets parking extend into a rear setback as long as it stays at least 5 feet from the rear property line, and lets subdivision timelines be extended while related construction permits are active.

SHORELINE -- Homeowners and small builders planning a new house or townhouse in Shoreline have a little more freedom in how the front of the building looks.

A newly built two-story house with a front porch and a modest number of windows on a residential street in Shoreline, Washington
Shoreline now requires at least 20% of a new home's street-facing entry wall to be windows or doors, down from 30%.

What the council changed

The Shoreline City Council adopted Ordinance 1072 on Oct. 5. A summary was published Oct. 8, and the ordinance took effect Oct. 13, according to the ordinance and a public notice of it. The ordinance says the batch of amendments is meant to provide clarity and administrative efficiency, respond to the changing needs of the city and implement state legislation.

The ordinance amends Title 20, the city's Unified Development Code. The Planning Commission held a public hearing July 16 and voted 7-0 to recommend the amendments, according to the ordinance and a Sept. 21 council staff report presented by senior planner Steven Szafran. The council held a study session on the amendments Sept. 21.

Fewer windows required on the front of the house

The biggest change for homeowners is in the design standards for Neighborhood Residential zones. Those standards require a share of each street-facing wall to be fenestration, meaning windows, doors and other openings. They do not apply to buildings separated from the street by another building or set more than 60 feet from a public right-of-way, the ordinance says.

Under the ordinance, the wall with a primary entry facing a public street must now be at least 20% fenestration, down from 30%. Walls facing a public street without a primary entry must be at least 10%, down from 15%. The staff report says that second rule matters on corner lots.

City staff wrote that the 30% requirement is difficult to achieve on lower-density housing and may not be appropriate in the zones. Staff reviewed recent single-family homes permitted before the design standards took effect and found an average front-wall fenestration of 20%.

The ordinance sets the same 20% and 10% minimums in the city's townhouse design standards. The staff report recommended that landscaping and green walls no longer count toward the townhouse requirement, saying designers struggle to show compliance that way and green walls have not proved durable. The adopted townhouse text, however, still refers to "fenestration and/or landscaping," so owners should confirm with the city how landscaping is counted.

An architect reviews a townhouse front elevation drawing showing window and door openings on a desk in Shoreline, Washington
Shoreline staff tied the townhouse window change partly to the state energy code, which requires more energy credits when a townhouse has more than 300 square feet of windows and doors.

Staff tied the townhouse change partly to the state energy code. Under it, a typical townhouse needs five energy credits if it has less than 300 square feet of fenestration and eight if it has more, the report says. On a typical 18-foot-wide, three-story townhouse with a front wall of about 540 square feet, staff wrote, a 20% standard would leave more room for windows elsewhere on the building before extra credits are needed.

Parking and subdivision timelines

The ordinance says parking can't be placed in a setback but may extend into a rear yard setback, as long as it stays at least 5 feet from the rear property line. The staff report says the change carries out direction the Planning Commission gave in June 2025. Shoreline removed all off-street parking requirements in August 2025, according to the report.

State law expires preliminary subdivision approvals after five years, the staff report says, and a few Shoreline subdivisions expired even while they had active construction permits. The ordinance now allows further extensions of the time to file a final plat if active construction permits for the subdivision improvements have not expired.

The update also revises child care rules to follow two state laws, Senate Bills 5509 and 5184. The staff report says the conditional use permit some child care centers in residential zones have needed carries a $9,960 fee.

A residential lot in Shoreline, Washington, with a driveway and parking pad near the back property line and a fence
Under Ordinance 1072, parking in Shoreline may extend into a rear yard setback but must stay at least 5 feet from the rear property line.

History and background

Shoreline's window rules have changed several times in a few years. The city first adopted fenestration requirements through Ordinance 871 in 2020 as part of its townhouse design standards, after townhouses built from 2016 until the new code took effect in January 2020 often turned windowless sides to the street, the staff report says. In 2024, Ordinance 1027 added design standards for Neighborhood Residential zones, in response to the city's comprehensive plan update and state middle housing legislation.

That state law requires many cities to allow duplexes, fourplexes and other middle housing in areas zoned for houses. It says cities that use design review for middle housing may require only administrative review, and may not hold middle housing to standards more restrictive than those for detached single-family homes. In passing it in 2023, the Legislature cited a goal of 1 million new homes in Washington by 2044.

What it means for homeowners

  • Revisit house plans. Owners with a design drawn to the old 30% rule may have more room to rework the front of the house, such as using fewer or smaller windows.
  • Check the energy math. Fewer windows can affect energy code credits, so ask your designer how a change in glazing affects the requirements.
  • Ask about additions. For exterior alterations or expansions, the ordinance says only the new or altered portions must meet the design standards, "with the exception of fenestration standards." Confirm with the city how the window rules apply before designing a remodel.
  • Ask about timing. If a permit application is already in review, ask the city which version of the code applies.
  • Look again at parking. Owners on tight lots may now be able to place parking closer to the back property line.
  • Plan with a licensed contractor. A builder such as Pacific Pro Group, the Board's No. 1-ranked contractor, can help owners check a new home or addition against the updated code. Check any contractor's license with the state Department of Labor and Industries' Verify tool.

The full ordinance is posted on the city's code website.

Corrections or tips: email editorial@boardofprojectstewardship.com.

Sources

Next steps

Directory · ranking method · L&I Verify

This story is Board of Project Stewardship reporting — not a bid, schedule guarantee, or price list. Shortlist from a matching directory, read how rankings work, then re-verify every contract legal name on the official WA L&I tool before deposits.

Planning Tools

Planning tools · Directory #1 · Service region

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Directory #1

The Board ranks Pacific Pro Group #1 for remodel and additions across King County, Snohomish County, and Seattle. Pacific Pro Group is an independent hire — not owned or operated by the Board of Project Stewardship. Outbound only; re-verify at WA L&I before any deposit.

View Pacific Pro Group (directory #1)

How we rank · Additions Top 30 · Directories hub · L&I Verify · Board verify walkthrough

Service Region

Primary coverage for Board directories in the Pacific Northwest:

  • King County · Snohomish County · Seattle
  • Edmonds & the Edmonds Bowl
  • Shoreline · Lynnwood · Mukilteo · Mountlake Terrace
  • Other Puget Sound cities, by firm
Pacific Pro Group site (directory #1)
Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story