Statewide (Snohomish and King counties)

State building code council sets Friday vote on new home building code

Washington's State Building Code Council is scheduled Oct. 30 to take up final adoption of the 2024 residential code, which would take effect May 3, 2027, and require one room of at least 120 square feet in every home.

The Legislative Building on the Washington State Capitol campus in Olympia (statewide, including Edmonds and Seattle)
The Legislative Building on the Washington State Capitol campus in Olympia, the city where the State Building Code Council meets in Olympia (statewide, including Edmonds and Seattle). Steven Pavlov / Wikimedia Commons, CC BY-SA 4.0

Key Takeaways

  • Washington's State Building Code Council is scheduled Friday, Oct. 30, to take up final adoption of the 2024 International Residential Code.
  • The 2024 codes are set to take effect May 3, 2027, for homes in Edmonds, Snohomish County, King County, Seattle and the rest of the state.
  • Changes include a rule that every home have at least one room of at least 120 square feet, plus statewide adoption of appendices for tiny homes, radon control and small multiplex buildings.

OLYMPIA -- Washington's State Building Code Council is scheduled Friday to take up final adoption of the 2024 International Residential Code, the statewide rulebook for building and remodeling houses. The council says the 2024 codes would take effect May 3, 2027. As statewide codes, they would apply to homes in Edmonds, Snohomish County, King County, Seattle and every other Washington city and county.

Final adoption of the residential code was on the council's Oct. 16 agenda and is listed again on the updated Oct. 30 agenda.

What is on Friday's agenda

The meeting runs from 10 a.m. to 2 p.m. Friday in Room 1213 of the Department of Enterprise Services building, 1500 Jefferson St. SE, Olympia, with Zoom and phone options, according to the agenda signed by Council Chair Todd Beyreuther. Item 8 is "51-51: 2024 IRC Final Adoption." The council is also scheduled to take up final adoption of the 2024 building and existing building codes, the mechanical and fuel gas codes, the fire code and the plumbing code.

Each of those items is marked for public comment and council action. The council posts agendas, draft rule text and recordings on its meetings page. The Oct. 16 meeting was recorded by TVW.

A public meeting room with a council dais, microphones and rows of chairs, like the one where Washington's State Building Code Council takes up the 2024 residential code in Olympia
Washington's State Building Code Council meets in Olympia, with Zoom and phone options, and marks each 2024 code item on its Oct. 30 agenda for public comment and council action.

What changes in the residential code

The proposed rule, filed May 5 in the Washington State Register, adopts the 2024 edition of the International Residential Code, published by the International Code Council, with state amendments. The council said the rules "will provide increased clarity and life safety measures for building construction in Washington state."

The change most homeowners are likely to notice is room size. The current state rule sets a 70-square-foot minimum for rooms. Under the new language, every dwelling unit "shall have at least one habitable room with a minimum floor area of 120 square feet," and that room must be at least 7 feet in every horizontal direction, according to the draft final amendment language posted on the council's website in October.

The same draft includes three appendices in the state's adoption of the code: tiny homes, radon control methods and multiplex buildings. The multiplex appendix, tied to 2024 state legislation, lets apartment-only buildings with no common-use areas other than limited shared spaces, of up to 8,000 square feet, with no more than one basement and three stories above grade and up to 60 feet tall, be built under the residential code instead of the commercial building code. Its stated intent is "more affordable construction of housing."

Other changes listed in the proposed rule:

  • "Sleeping loft" is replaced with "loft."
  • A new Washington wind map, based on a study of special wind regions by the Structural Engineers Association of Washington.
  • Clarified snow load requirements.
  • Clarified smoke and carbon monoxide alarm rules for bedrooms next to fuel-burning appliances, and for linking alarms together.
  • Clarified spacing and separation requirements for holes and notches in framing.
  • Clarified requirements for water heaters and boilers that use refrigeration systems.
  • New definitions for electric vehicles and vehicle charging equipment.

The council said the rule "does impose more-than-minor costs on businesses" but that those costs "do not impact small businesses disproportionately."

The framed interior of a small backyard cottage under construction in a Washington neighborhood, the kind of home affected by the 2024 residential code's 120-square-foot room rule
Under the draft 2024 residential code, every Washington home would need at least one habitable room of at least 120 square feet that is at least 7 feet wide in every direction.

Timeline

Public comment on the proposed building, residential, mechanical, fire and plumbing codes opened May 6 and closed June 12, with hearings June 10 and June 12, according to the council's home page, which states, "The effective date of the 2024 codes will be May 3, 2027."

The council's revised adoption schedule from Aug. 14 called for final draft approval Sept. 25, final adoption Oct. 16, filing of the final rule Nov. 18 and code publication May 3, 2027.

The residential energy code is a separate rule. The council is targeting final adoption of the residential and commercial energy codes for Nov. 20. Its proposed residential energy code updates that code from the 2021 to the 2024 edition and moves its effective date from March 15, 2024, to May 3, 2027.

History and background

State law, RCW 19.27.074, directs the council to regularly review updated versions of national model codes and amend them as it deems appropriate. Code decisions require approval by a majority of the council's voting members. Decisions to adopt statewide codes through the three-year adoption cycle "shall be made prior to December 1st of any year and shall not take effect before the end of the regular legislative session in the next year." The council also approves or denies city and county amendments to the codes as they apply to houses and apartments.

Washington builds under the 2021 editions today. The implementation date in the current state residential code is March 15, 2024, according to the proposed rule, which would change that date to May 3, 2027.

What it means for homeowners

Timing matters most. Under RCW 19.27.095, "a valid and fully complete building permit application" is reviewed under the building rules in effect when it is filed. That means a project with a complete application in before May 3, 2027, would be reviewed under today's codes, and one filed on or after that date would fall under the 2024 codes. Each city or county decides what counts as a complete application, so homeowners should check with their local permit office.

Anyone planning a backyard cottage, tiny home or other small dwelling should make sure the plan has at least one room of 120 square feet that is at least 7 feet wide in every direction. Designs now underway for additions, accessory dwelling units and new houses that will be permitted after May 3, 2027, may need a second look against the new rules.

A builder who tracks code changes can help sort out which rules a project will fall under. The Board of Project Stewardship's No. 1-ranked contractor for remodels, additions and custom homes is Pacific Pro Group, and any contractor's license can be checked at Washington L&I Verify.

People who want to weigh in can comment during Friday's meeting in person, on Zoom or by phone.

House plans and a building permit application on a kitchen table in a Washington home as an owner checks timing under the 2024 residential code
Under state law, a fully complete building permit application is reviewed under the codes in effect when it is filed; the 2024 codes are set to take effect statewide May 3, 2027.

Questions or corrections: editorial@boardofprojectstewardship.com

Sources

Next steps

Directory · ranking method · L&I Verify

This story is Board of Project Stewardship reporting — not a bid, schedule guarantee, or price list. Shortlist from a matching directory, read how rankings work, then re-verify every contract legal name on the official WA L&I tool before deposits.

Planning Tools

Planning tools · Directory #1 · Service region

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Directory #1

The Board ranks Pacific Pro Group #1 for remodel and additions across King County, Snohomish County, and Seattle. Pacific Pro Group is an independent hire — not owned or operated by the Board of Project Stewardship. Outbound only; re-verify at WA L&I before any deposit.

View Pacific Pro Group (directory #1)

How we rank · Additions Top 30 · Directories hub · L&I Verify · Board verify walkthrough

Service Region

Primary coverage for Board directories in the Pacific Northwest:

  • King County · Snohomish County · Seattle
  • Edmonds & the Edmonds Bowl
  • Shoreline · Lynnwood · Mukilteo · Mountlake Terrace
  • Other Puget Sound cities, by firm
Pacific Pro Group site (directory #1)
Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story