King County

Kirkland council signals support for more, smaller middle housing homes

At an Oct. 20 study session with no vote, Kirkland councilmembers leaned toward reworking floor area limits so a lot could hold more, smaller homes instead of one big house and two accessory dwelling units, according to two local advocacy groups' recaps, which also say the Planning Commission is next. Nothing has been adopted.

Two cottages from the Danielson Grove cottage housing development sit behind conventional houses in Kirkland, Washington
Two cottages from the Danielson Grove cottage housing development sit behind conventional houses in Kirkland, Washington, a mix of small and large homes at the center of the city's middle housing discussion. Brett VA / Wikimedia Commons, CC BY 2.0

Key Takeaways

  • After an Oct. 20 study session with no vote on a short-term update to Kirkland's middle housing rules, two local advocacy groups reported that Kirkland City Council members gave staff direction and that most or all members favored an option to rework floor area limits.
  • City staff showed that, under the same 50% floor area limit, a lot that one plan used for a 3,234-square-foot house and two accessory dwelling units (ADUs) could instead hold four 1,200-square-foot homes.
  • Nothing has been adopted. According to the advocacy groups' recaps, the Planning Commission takes the project up next and will hold a public hearing.

KIRKLAND -- Kirkland may soon rework the size limits that shape how many homes fit on a single-family lot, but no rules have changed yet.

A small new cottage home built behind an older single-story house on a residential lot in Kirkland, Washington
Kirkland staff say middle housing projects usually build up to the city's floor area and lot coverage limits, which favors fewer, larger units.

What the council discussed

The Kirkland City Council held a study session Oct. 20 on what the city calls its Middle Housing Focused Optimization project. A study session is a briefing and discussion, not a vote. The staff presentation describes the project as near-term code adjustments to streamline and encourage middle housing and age-friendly housing, ahead of a broader review planned for 2028.

Staff offered four options:

  • Streamline existing regulations, such as making floor area calculations and exemptions consistent across housing types.
  • General optimization, including floor area and lot coverage limits that rise in tiers as more units are added.
  • Encourage keeping existing homes and age-friendly housing, for example by exempting a retained house from density, lot coverage or floor area math, allowing setback flexibility for it, and allowing more lot coverage and floor area for stacked flats.
  • Take no action until the broader 2028 project, when height and reduced setbacks could be considered.

Councilmembers did not vote. According to the Liveable Kirkland newsletter, all seven members expressed support for some form of the second option, along with broad support for streamlining and support for the third option, though Mayor Kelli Curtis cautioned that it could take longer. A recap by Cherish Kirkland described the outcome as "direction, no vote," with most members backing the second option and several wanting pieces of the first and third. Both are local advocacy groups. Official minutes were not reviewed for this story.

Why size limits matter

Kirkland residential lots are capped at a floor area ratio of 50% of the lot size and, outside the Holmes Point Overlay, lot coverage of 50%, according to the presentation. Cottages are capped at 1,700 square feet plus a 250-square-foot garage, and ADUs at 1,200 square feet including any garage. Staff said projects typically build up to those limits and rarely keep an existing home.

An architect reviews a site plan showing four small homes on one residential lot on a desk in Kirkland, Washington
Kirkland staff showed that a 9,613-square-foot lot could hold four 1,200-square-foot homes under today's 50% floor area limit.

The presentation used one real site plan to show the trade-off. On a 9,613-square-foot lot, the plan called for a 3,234-square-foot house, a 1,025-square-foot attached ADU and a 1,200-square-foot detached ADU. Under the same 50% floor area limit, staff said, the lot could instead hold four 1,200-square-foot homes. At a hypothetical 60%, it could hold four 1,440-square-foot homes, or keep an existing 1,000-square-foot single-level house and add three 1,590-square-foot units.

Middle housing permits have grown. Kirkland issued building permits for 168 new middle housing units from March 2025 through February 2026 -- 55 ADUs, 111 cottages and two other units -- compared with 20 units from March 2020 through February 2021, according to the presentation, which also listed 69 units (34 ADUs and 35 cottages) from March through August 2026.

Staff listed other possible changes, such as folding the cottage garage allowance into a single size limit (for example, 1,950 square feet). The presentation says the project will not change heights, setbacks, affordable-housing requirements, tree protection, units-per-acre limits or stormwater rules.

History and background

Kirkland first allowed ADUs in 1995 and adopted its first rules for cottages, duplexes and triplexes in 2007, according to the presentation. In 2020 the city overhauled those rules to streamline review.

The bigger change came from Olympia. Under RCW 36.70A.635, passed in 2023 as House Bill 1110, cities of at least 75,000 people must allow at least four units per lot on lots zoned predominantly residential, and at least six within a quarter-mile walk of a major transit stop or when at least two units are affordable.

Kirkland responded with Ordinance O-4905, adopted June 17, 2025, according to the city's middle housing code page. It allows four units per lot in all residential zones and six within a half-mile of a major transit stop, removed size limits on second ADUs and set a 0.5-space parking requirement for middle housing units. Starting Jan. 1, 2027, new units over 2,000 square feet in low-density zones must include a 10% affordable set-aside or pay a fee instead, the page says.

Also on Oct. 20, the council voted 6-0 on two motions asking staff to develop lot coverage and tree-removal options for the Holmes Point Overlay, according to Cherish Kirkland. The group reported that the lot coverage options would range from roughly 40% to 50%.

A homeowner and a builder look over plans in the backyard of an older house in Kirkland, Washington
No middle housing changes have been adopted; local advocacy groups report the project goes next to the Planning Commission, which will hold a public hearing.

What it means for homeowners

  • Nothing changes yet. Today's floor area, lot coverage and unit size limits still apply to any ADU, cottage or lot-split plan.
  • Watch the Planning Commission. Liveable Kirkland reported that the commission is scheduled to take a first look Nov. 12, and that the project runs through mid-2027. Cherish Kirkland said the commission will hold the public hearing.
  • Think about the house you have. If the option to keep existing homes moves forward, the presentation lists exempting a retained unit from density, lot coverage and/or floor area calculations among the potential adjustments.
  • Plan with a licensed contractor. A builder such as Pacific Pro Group, the Board's No. 1-ranked contractor, can help owners check what a lot allows under today's code. Check any contractor's license with the state Department of Labor and Industries' Verify tool.

The staff presentation is posted with the city's Oct. 20 agenda.

Corrections or tips: email editorial@boardofprojectstewardship.com.

Sources

Next steps

Directory · ranking method · L&I Verify

This story is Board of Project Stewardship reporting — not a bid, schedule guarantee, or price list. Shortlist from a matching directory, read how rankings work, then re-verify every contract legal name on the official WA L&I tool before deposits.

Planning Tools

Planning tools · Directory #1 · Service region

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Directory #1

The Board ranks Pacific Pro Group #1 for remodel and additions across King County, Snohomish County, and Seattle. Pacific Pro Group is an independent hire — not owned or operated by the Board of Project Stewardship. Outbound only; re-verify at WA L&I before any deposit.

View Pacific Pro Group (directory #1)

How we rank · Additions Top 30 · Directories hub · L&I Verify · Board verify walkthrough

Service Region

Primary coverage for Board directories in the Pacific Northwest:

  • King County · Snohomish County · Seattle
  • Edmonds & the Edmonds Bowl
  • Shoreline · Lynnwood · Mukilteo · Mountlake Terrace
  • Other Puget Sound cities, by firm
Pacific Pro Group site (directory #1)
Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story