King County

Seattle opens Environmentally Critical Areas code update with October listening sessions

SDCI is making its first major update to Seattle's Environmentally Critical Areas code since 2017 and will hold four online listening sessions Oct. 22-29 before drafting changes.

A hillside home set back from a wooded ravine and creek in Seattle
A hillside home set back from a wooded ravine and creek in Seattle.

Key Takeaways

  • Seattle is updating its Environmentally Critical Areas (ECA) code to align with state law, the One Seattle Plan, and the latest best available science.
  • The city is hosting four online listening sessions in October 2026 to gather feedback from watershed groups, environmental organizations, professionals, and the general public.
  • The update aims to create clearer, more predictable regulations for development in areas involving steep slopes, wetlands, flood-prone areas, and other geologic hazards.

Listening sessions and how to comment

SEATTLE — The Seattle Department of Construction and Inspections (SDCI) has started updating the city's Environmentally Critical Areas (ECA) code and is seeking input from stakeholders and residents, the department said in a Sept. 29 Building Connections post. As part of the initial engagement process, the city is hosting four one-hour online listening sessions in October 2026 to hear from those who work with critical areas or have experience with the permitting process. SDCI said people who have been through permitting or who have critical areas on their property, such as steep slopes, wetlands or streams, can help shape the updates.

The listening sessions are scheduled as follows, according to the SDCI project page and Public Participation Plan:

  • Session 1: Local Watershed Groups – Thursday, Oct. 22, 11 a.m. to noon.
  • Session 2: Environmental Organizations – Friday, Oct. 23, 11 a.m. to noon.
  • Session 3: Environmental Professionals (biologists, landscape architects, engineers and others) – Wednesday, Oct. 28, noon to 1 p.m.
  • Session 4: Open Session (open to all interested stakeholders, including those with permitting experience) – Thursday, Oct. 29, noon to 1 p.m.

For those unable to attend the October sessions, the city is tentatively planning an open house for January 2027. Written comments may be submitted at any time via email to project lead Chanda Emery at Chanda.Emery@seattle.gov.

What the update covers

The ECA code update focuses on areas of Seattle that require additional regulation due to unique geologic conditions or high environmental function. According to SDCI's Public Participation Plan, ECAs include:

  • Steep slope erosion hazard areas
  • Geologic hazard areas
  • Flood-prone areas
  • Wetlands
  • Fish and wildlife habitat conservation areas
  • Abandoned landfills

The city states that these regulations are necessary to protect the environment and public safety by promoting development that is stable and compatible, while avoiding or mitigating adverse impacts. SDCI said the update is meant to improve the effectiveness of these policies to better manage development in hazardous areas and enhance the urban environment by protecting wetlands, fish and wildlife habitat, riparian corridors and other ecological resources. The department described the health of these areas as an important indicator of the overall health and well-being of the city.

Steep wooded slope behind houses in a Seattle neighborhood
A steep wooded slope behind Seattle houses, the kind of land the Environmentally Critical Areas code covers.

How the process works

The update process is guided by a Public Participation Plan designed to ensure transparency and follow state requirements. The process includes several stages of engagement and review:

Public engagement

SDCI is utilizing the City’s Racial Equity Toolkit, a framework integrated into the Seattle Municipal Code, to evaluate how policies affect racial disparities. Additionally, the city is initiating government-to-government outreach to invite tribal participation.

Feedback and drafting

The October listening sessions occur prior to the first draft of code revisions. Following the creation of the first draft, the city will host an online open house to present recommendations and solicit further feedback.

Legislative review

Once a proposal is developed, it will be reviewed by the Seattle City Council’s Land Use Committee. This committee reviews policies and code changes related to zoning and development before voting on whether to recommend the proposal to the full City Council for final action.

Information access

The city maintains a dedicated project website as the primary repository for status updates, draft documents, and meeting minutes. SDCI also plans a monthly newsletter and social media updates, and an email distribution list is available through the project website. Official notices are also published in the SDCI Land Use Information Bulletin and the Daily Journal of Commerce.

History and background

The current regulations for Environmentally Critical Areas are found in Seattle Municipal Code Chapter 25.09. The last major update to this code occurred in 2017.

According to the SDCI project page, the update is driven by the state Growth Management Act (GMA), which requires local governments to adopt development regulations that protect critical areas to maintain wildlife habitat and reduce risks such as flooding and landslides. The GMA requires local governments to include Best Available Science (BAS) in developing policies and regulations to protect the functions and values of critical areas, and several state agencies provide guidance on meeting that requirement.

The 2026 update is intended to incorporate current BAS and align the code with updated state statutes and local planning documents, specifically the One Seattle Plan (Comprehensive Plan Update).

Homeowner reviewing a site plan with a marked slope buffer for a Seattle remodel
Reviewing a site plan that marks a slope buffer before a Seattle remodel.

What it means for homeowners

For homeowners planning to build a new home, add an addition, or install an accessory dwelling unit, these updates are critical if the property contains steep slopes, wetlands, streams, or other designated critical areas. No draft code changes have been released yet, so it is too early to say how specific rules will change. Because ECA standards govern development in hazard areas and near ecological resources, owners with those features have a direct stake in the outcome and can weigh in during the October sessions, by email or at the planned open house.

Homeowners should monitor the SDCI project page for updates to the code and the project schedule to ensure their plans remain compliant with the latest regulations. When hiring professionals to navigate these critical area requirements, homeowners should verify their contractors' licenses and bonds through the Washington L&I Verify website.

On projects where the Board of Project Stewardship’s #1 hire fits, Pacific Pro Group is the Board’s recommended contractor path for King and Snohomish County homeowners comparing scopes in writing.

Questions or corrections: editorial@boardofprojectstewardship.com

Sources

Next steps

Directory · ranking method · L&I Verify

This story is Board of Project Stewardship reporting — not a bid, schedule guarantee, or price list. Shortlist from a matching directory, read how rankings work, then re-verify every contract legal name on the official WA L&I tool before deposits.

Planning Tools

Planning tools · Directory #1 · Service region

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Directory #1

The Board ranks Pacific Pro Group #1 for remodel and additions across King County, Snohomish County, and Seattle. Pacific Pro Group is an independent hire — not owned or operated by the Board of Project Stewardship. Outbound only; re-verify at WA L&I before any deposit.

View Pacific Pro Group (directory #1)

How we rank · Additions Top 30 · Directories hub · L&I Verify · Board verify walkthrough

Service Region

Primary coverage for Board directories in the Pacific Northwest:

  • King County · Snohomish County · Seattle
  • Edmonds & the Edmonds Bowl
  • Shoreline · Lynnwood · Mukilteo · Mountlake Terrace
  • Other Puget Sound cities, by firm
Pacific Pro Group site (directory #1)
Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story