Snohomish County

Everett lets homeowners split lots as small as 2,000 square feet

The Everett City Council on Oct. 14 passed a land division overhaul that cuts the minimum lot size in most neighborhoods from 5,000 to 2,000 square feet and lets owners sell a new lot before utilities or landscaping are built.

Everett City Hall, a historic building at 3002 Wetmore Ave. in downtown Everett, Washington
Everett City Hall, a historic building at 3002 Wetmore Ave. in downtown Everett, Washington. Joe Mabel / Wikimedia Commons, CC BY-SA 3.0

Key Takeaways

  • Everett homeowners in most residential neighborhoods can now divide lots as small as 2,000 square feet, down from 5,000 square feet.
  • Owners can divide and sell a lot before utilities, landscaping or access are built; the city can instead require that work before a building permit is issued.
  • The overhaul folds several land division chapters of city code into one and moves more decisions to a simpler staff review.

EVERETT -- Everett homeowners can now divide residential lots as small as 2,000 square feet, down from 5,000, and sell a new lot before utilities or landscaping are built, under a land division overhaul the City Council passed Oct. 14.

The council passed Ordinance No. 4207-26, which amends the city's land division procedures and development standards. The legal notice, published Oct. 17, says the ordinance amends Chapters 13.16, 13.68, 19.01, 19.04, 19.06, 19.33, 19.34, 19.38, 19.35 and 15.02 of the Everett Municipal Code, repeals Chapters 19.24 through 19.27 and adds a new Chapter 19.23. The Everett Herald reported that the changes consolidate four chapters of city code into one.

The Herald reported that Everett already complied with the 2025 state lot-splitting law but went further, allowing owners to sell smaller plots to help first-time buyers find small homes in their price range.

Smaller lots in NR and UR4 zones

The proposal in the council packet lowers the standard minimum lot dimensions for long and short subdivisions in the NR and UR4 zones:

  • Lot area: from 5,000 to 2,000 square feet.
  • Lot width: from 50 feet to 25 feet.
  • Lot depth: from 80 feet to 60 feet.
  • Lot frontage: from 40 feet to 25 feet.

The NR-C zone keeps its 9,000-square-foot minimum, according to the packet.

A survey stake with pink flagging marks a backyard lot line next to a house in Everett
Everett homeowners in the NR and UR4 zones can divide residential lots as small as 2,000 square feet under the new land division rules.

Selling before infrastructure is built

The proposal removes the requirement that access, recreation facilities, utility stubs and landscaping be installed and inspected, or bonded, before land is divided and a lot is sold. Instead, the city can record conditions on the face of the plat requiring that the necessary infrastructure be provided before building permits are issued.

It also drops the requirement that gaps and encroachments found by a survey be resolved before a land division is approved. The staff memo says those disputes revert to a civil matter between the affected parties, "as is the case in most jurisdictions."

Utility stubs and a gravel driveway apron on a newly created residential lot in Everett before building
Under the overhaul, Everett can let a new lot sell before utilities and landscaping are built, then require that work before a building permit.

How lot splits work in Everett

Under the proposal, residential lot splits allowed by state law, RCW 58.17.145, are processed as a short subdivision or a unit lot short subdivision. Other changes in the packet:

  • Faster review: Unit lot land divisions move from Review II, an administrative decision with public notice, to a Review I administrative decision. Short subdivisions of up to nine lots are also Review I decisions.
  • Appeals: Two-lot short subdivisions are exempt from administrative appeal.
  • Renters: If a split would require demolishing or altering a home in a way that displaces a renter, the applicant must recommend a displacement mitigation strategy, which may include relocation assistance.
  • Alley access: Lots that abut an alley or that end up separated from an alley by a land division are limited to alley access for parking. Street curb cuts are allowed only as an exception.
A cottage-scale house under construction on a narrow lot beside an older Craftsman home in Everett
Smaller minimum lot width and frontage in Everett are meant to support fee-simple ownership of homes on compact lots.

What officials said

Planning Director Yorik Stevens-Wajda said at the council meeting, "That doesn't mean that there is going to be more development closer to someone than it otherwise would have been, it just supports a more simple form of ownership and land division," the Herald reported. He said the law does not change rules on where buildings can be built or how tall they can be.

Councilmember Ben Zarlingo said, "Our opportunities for ownership and gradual density is going to be more of this kind of thing." The Herald reported he said the changes matter for ownership opportunities because condo development in the region has remained stagnant.

The Planning Commission reviewed the changes May 11, July 7 and Aug. 18 and recommended approval, and the council held a public hearing Sept. 9, according to the packet.

History and background

From 1956 to 1992, most of Everett's residential land, in the R-S, R-1 and R-2 zones, was limited to one dwelling unit per lot, according to a Planning Commission memo. The city began allowing attached accessory dwelling units in 1992, and in 1993 the Legislature passed the Housing Policy Act, which encouraged cities to allow accessory apartments in single-family zones. Everett first allowed detached ADUs in 2017, one per lot. In 2023 it allowed two ADUs and dropped the owner-occupancy requirement.

The Everett 2044 comprehensive plan update took effect in July 2025. Since then, the city has not limited how many homes can go on a lot as long as setbacks, height limits and maximum lot coverage are met. Two of its housing policies call for land division into "small fee simple lots where condominium ownership of a housing unit would not otherwise be allowed" and for lot splits that encourage homeownership "by simplifying regulations and streamlining the approval process."

The state's 2025 lot-splitting law, House Bill 1096, requires cities to offer an administrative lot split with no public hearing before the decision. Under RCW 58.17.145, a split may create only one new lot, both lots must meet the minimum lot size, water and sewer providers must certify availability, and the recorded survey must note that no further splits are allowed. Lots that are not buildable under critical areas, shoreline, stormwater, setback, impervious surface or building coverage rules are not eligible. Lawmakers found that lot splitting "can provide current owners the opportunity to maintain homeownership in changing life circumstances." Everett's deadline to comply was July 27, 2027, according to the city memo. A separate state law, RCW 58.17.060, requires cities to adopt summary approval procedures for short plats.

Everett acted hours after the Snohomish County Council passed its own law simplifying lot splits in unincorporated areas, the Herald reported. In Edmonds, the City Council on Oct. 13 adopted Ordinance 4449, an interim rule letting staff decide requests to vacate short plats; My Edmonds News reported that state law requires a process the city lacked.

What it means for homeowners

The new rules apply only inside Everett city limits. Owners should first confirm their zoning: the smaller minimums apply in the NR and UR4 zones, while NR-C keeps its larger minimum.

A split still requires a survey recorded with the county, water and sewer availability, and a new lot that is buildable under critical areas, setback and coverage rules.

Because the city can attach infrastructure conditions to the plat, a building permit on a new lot may depend on utilities, access and frontage work that the buyer or builder must pay for. Sellers and buyers should budget for those costs, and anyone planning a new driveway should check alley access rules first, since street curb cuts may be restricted.

Under the proposal, adding one or two accessory dwelling units to a lot whose main house stays in place is exempt from frontage street improvement requirements.

Pacific Pro Group, the Board of Project Stewardship's No. 1 hire, is one contractor homeowners can ask to help plan and budget for an ADU or a new home on a smaller lot.

The full ordinance text is available from the deputy city clerk at 2930 Wetmore Ave., Suite 1-A. Everett planning can be reached at 425-257-8725.

Questions or corrections: editorial@boardofprojectstewardship.com

Sources

Next steps

Directory · ranking method · L&I Verify

This story is Board of Project Stewardship reporting — not a bid, schedule guarantee, or price list. Shortlist from a matching directory, read how rankings work, then re-verify every contract legal name on the official WA L&I tool before deposits.

Planning Tools

Planning tools · Directory #1 · Service region

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Directory #1

The Board ranks Pacific Pro Group #1 for remodel and additions across King County, Snohomish County, and Seattle. Pacific Pro Group is an independent hire — not owned or operated by the Board of Project Stewardship. Outbound only; re-verify at WA L&I before any deposit.

View Pacific Pro Group (directory #1)

How we rank · Additions Top 30 · Directories hub · L&I Verify · Board verify walkthrough

Service Region

Primary coverage for Board directories in the Pacific Northwest:

  • King County · Snohomish County · Seattle
  • Edmonds & the Edmonds Bowl
  • Shoreline · Lynnwood · Mukilteo · Mountlake Terrace
  • Other Puget Sound cities, by firm
Pacific Pro Group site (directory #1)
Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story