Board of Project Stewardship · Mercer Island · Eastside · King County

Mercer Island remodels — Lake Washington shoreline, seasonal work limits

Mercer Island’s entire shoreline jurisdiction is Lake Washington — and “shoreline exempt” still means city review, not a skip. Land clearing, grading, filling, and foundation work are not permitted Oct 1–Apr 1 in landslide / steep-slope / erosion hazard areas without a Seasonal Development Limitation Waiver backed by geotech. This Board of Project Stewardship hub orients island kitchen, bath, and addition planning around that calendar and bridge-access logistics.

Field context · Mercer Island (illustrative)

Mercer Island residential exterior remodel context
Mercer Island residential exterior remodel context.
Kitchen remodel interior for Mercer Island homeowners — PNW materials
Kitchen remodel interior for Mercer Island homeowners — PNW materials.
Bathroom remodel scene for Mercer Island — waterproofing-minded PNW context
Bathroom remodel scene for Mercer Island — waterproofing-minded PNW context.

General process video (not specific to Mercer Island)

Educational construction process video for Mercer Island planning context — not a Board project walkthrough or guarantee.

Who permits work in Mercer Island?

City of Mercer Island Development Services / Permit Submittal Portal is the AHJ. SSDP vs Shoreline Exemption still requires city review. Geological Hazards guidance requires stamped WA-licensed geotech reports in coal-mine/erosion, landslide, steep-slope, seismic, or flood contexts. Shoreline exemptions can carry mitigation planting and multi-season monitoring; WDFW HPA may still apply for in-water work.

Full permit jurisdiction hub · Verify contractor · Learn hub

Island kitchens with bridge-access logistics

Bridge-only access shapes cabinet deliveries as much as layout on Mercer Island. Mid-century ranches and custom SFH file wall and MEP moves through the island Permit Submittal Portal — never Seattle SDCI. Board of Project Stewardship notes stay educational on sequencing, not pricing.

Kitchen remodelers directory · Kitchen remodel planning

Bath remodels when shoreline covenants may attach

Waterproofing still leads. Shoreline exemption approvals can require mitigation planting and monitoring covenants that outlast the shower install. Confirm Lake Washington shoreline status before treating a bath as interior-only.

Bathroom remodelers directory · Bathroom waterproofing guide

Second-story additions under Mercer Island seasonal limits

Second-story and foundation work in mapped landslide/steep-slope/erosion areas collide with the Oct 1–Apr 1 wet-season ban unless a geotech-backed waiver is approved. Sequence grading and foundations around that calendar — the Board does not invent waiver odds.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Mercer Island.

Official

Official portals · Mercer Island

Live authority-having-jurisdiction (AHJ) links for Mercer Island. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Mercer Island hub FAQ

Is this a complete contractor list for Mercer Island?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Mercer Island. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Mercer Island?

City of Mercer Island Development Services / Permit Submittal Portal is the AHJ. SSDP vs Shoreline Exemption still requires city review. Geological Hazards guidance requires stamped WA-licensed geotech reports in coal-mine/erosion, landslide, steep-slope, seismic, or flood contexts. Shoreline exemptions can carry mitigation planting and multi-season monitoring; WDFW HPA may still apply for in-water work.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Does shoreline exemption mean no Mercer Island application?

No. Exempt work still requires city review. “Exempt” is not “no application.”

What is the wet-season work ban?

Land clearing, grading, filling, and foundation work are generally not permitted Oct 1–Apr 1 in landslide/steep-slope/erosion hazard areas (and 10 ft beyond top/toe) without a Seasonal Development Limitation Waiver backed by geotech.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound