Board of Project Stewardship · Woodway · Snohomish County

Woodway remodels — large-lot Quiet Place, bluff ECA inside the building permit

Woodway brands itself “The Quiet Place” — a primarily single-family Snohomish town just north of the King line whose founding deed restrictions pushed two-acre minimum parcels with large setbacks. Environmentally Critical Areas review for marine bluff and geologic/landslide hazards is integrated into the building or land-use permit via an ECA checklist — the town does not run a separate critical-areas permit. This Board of Project Stewardship hub orients site-sensitive kitchen, bath, and addition work to that large-lot bluff AHJ next to Edmonds — educational only.

Field context · Woodway (illustrative)

Woodway residential exterior remodel context in Puget Sound
Woodway residential exterior remodel context.
Kitchen remodel interior for Woodway homeowners — Puget Sound materials
Kitchen remodel interior for Woodway homeowners — PNW materials.
Bathroom remodel scene for Woodway — waterproofing-minded Puget Sound context
Bathroom remodel scene for Woodway — waterproofing-minded PNW context.

General process video (not specific to Woodway)

Educational construction process video for Woodway planning context — not a Board project walkthrough or guarantee.

Who permits work in Woodway?

Town of Woodway Building & Planning is the AHJ (townofwoodway.com). Use the Master Building and Clearing & Grading Permit Application plus the Environmentally Critical Areas Checklist when bluff or geologic hazards may be present. Confirm town limits vs Edmonds; do not assume Edmonds or Snohomish County PDS owns a Woodway parcel.

Full permit jurisdiction hub · Verify contractor · Learn hub

Large-lot kitchens when Woodway folds bluff review into building

Wooded two-acre-scale kitchens remodel under Woodway’s Master Building application — not Edmonds’ counter. Exterior equipment (heat pumps, etc.) still meets setback review. When marine bluff or geologic hazards map nearby, the ECA checklist rides with the building permit rather than a separate CA track. Educational — not a bid.

Kitchen remodelers directory · Kitchen remodel planning

Bath updates on Woodway’s wooded Quiet Place lots

Waterproofing leads. Plumbing/mechanical can ride the Master Building application; septic clearance via Snohomish Health District may still be required on some lots. Bluff-adjacent parcels add geotech expectations without inventing Edmonds marine SMP language.

Bathroom remodelers directory · Bathroom waterproofing guide

Woodway additions under large setbacks and integrated ECA review

Site-sensitive whole-home and addition projects meet historic large-setback expectations plus clearing/grading and ECA checklist diligence. Sequence Town Hall materials before a GC prices tree removal and foundations; the Board does not invent two-acre yields.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Woodway.

Official

Official portals · Woodway

Live authority-having-jurisdiction (AHJ) links for Woodway. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Woodway hub FAQ

Is this a complete contractor list for Woodway?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Woodway. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Woodway?

Town of Woodway Building & Planning is the AHJ (townofwoodway.com). Use the Master Building and Clearing & Grading Permit Application plus the Environmentally Critical Areas Checklist when bluff or geologic hazards may be present. Confirm town limits vs Edmonds; do not assume Edmonds or Snohomish County PDS owns a Woodway parcel.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Woodway permitted through Edmonds?

No. Town of Woodway Building & Planning is the AHJ for in-town parcels. Edmonds is the neighbor, not the counter.

Does Woodway issue a separate critical-areas permit?

Town guidance integrates Environmentally Critical Areas review (including marine bluff / geologic hazards) into the building or land-use permit via checklist — confirm live Town Hall materials for your parcel.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound