Board of Project Stewardship · Pacific · Mostly King · Pierce portion
Pacific remodels — White River flood permit beside the building desk
Pacific sits on the White River valley floor between Auburn and Algona, mostly in King County with a Pierce portion. City Flood Control chapter 23.40 requires a floodplain development permit for development in special flood hazard areas — structures, fill, and related site work — alongside ordinary building, mechanical, and plumbing permits. This Board of Project Stewardship hub keeps compact-lot kitchen, bath, and addition questions honest to that White River flood track — educational only.
Field context · Pacific (illustrative)
General process video (not specific to Pacific)
Educational construction process video for Pacific planning context — not a Board project walkthrough or guarantee.
Who permits work in Pacific?
City of Pacific Building Department is the AHJ for building, mechanical, and plumbing permits (pacificwa.gov/services/building). Electrical permits are administered by WA L&I. Floodplain development permits under PMC 23.40 apply in mapped SFHA and may need elevation certificates or no-rise analysis in floodways. Confirm city limits vs Algona or Auburn; confirm King vs Pierce for the parcel record.
- WA L&I Verify (contractor license) (opens in new window)
- City of Pacific (opens in new window)
- Pacific Building Department (opens in new window)
- Pacific Flood Control (PMC 23.40) (opens in new window)
Full permit jurisdiction hub · Verify contractor · Learn hub
Where do I shortlist contractors?
- Kitchen remodelers
- Bathroom remodelers
- Home additions directory
- Kitchen remodel planning
- Home addition planning
- King County hub
- Permit hub
Board #1 hire ranking: Pacific Pro Group (opens in new window). Re-verify at L&I Verify (opens in new window).
Compact-lot kitchens beside White River flood review
Smaller-lot suburban and older valley kitchens in Pacific remodel under the city’s Building Department — not Auburn’s. Wall moves need city permits; mapped SFHA parcels may also need floodplain development permit clearance before cabinet layout freezes around a raised or flood-aware floor. Educational — not a price list.
Bath remodels when Pacific stacks flood and plumbing permits
Waterproofing leads on valley wet rooms. Plumbing is city-issued; electrical stays with WA L&I. Flood Control chapter 23.40 can add elevation documentation when the bath sits in SFHA. Confirm Pacific — not Algona — before demo.
Bathroom remodelers directory · Bathroom waterproofing guide
Pacific additions on White River SFHA and cross-county edge lots
Compact-lot additions still meet Pacific zoning plus floodplain development rules when mapped. Floodway work can require no-rise engineering. Sequence flood and building tracks together; the Board does not invent White River map yields or Pierce/King shortcuts.
Service area map
Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.
Board #1 hire intake
Get Your Free Estimate
This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Pacific.
Official portals · Pacific
Live authority-having-jurisdiction (AHJ) links for Pacific. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.
Live Feasibility & Estimate Calculator
Planning estimate, not a bid.
Pre-Construction Package
Show Details for Feasibility Study
Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.
Specialists Included:
- Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
- Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
- Septic Design Engineer: Needed if property is not on municipal sewer.
- Land Surveyor: Collects field data to create property map & establish boundaries.
- Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
- Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits
Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.
Timeline: 4–8 months.
Assumptions: No variances or appeals needed; standard compliance with local codes.
Show Details for Blueprints & Layouts
Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.
Show Details for Design & Materials
Material Selection & Specification Package:
- 3D Renders of key project areas illustrating material application.
- Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
- Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering
Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.
Rough Timeline (4-6 weeks):
- Week 1: Initial site visit & proposal approval.
- Weeks 2-3: Field investigations (borings) & sampling.
- Weeks 4-5: Lab analysis & draft report.
- Week 6: Final report delivery.
Specialists:
- Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
- Soil Technician: Conducts on-site borings.
- Lab Analyst: Performs tests on soil bearing capacity/shear strength.
- Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering
Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.
Show Details for Survey
Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.
Construction Cost Estimation
Anticipated Project Schedule
Total Duration: 10 – 14 months
Planning/Permitting: 4 – 6 months
Construction: 6 – 8 months
Common Additions
Show Scope & Tier Pricing
Included Scope:
- Demo everything required for new project
- Plumbing: reroute pipes, install new supply/drains
- Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
- Install new drywall, mud, texture, primer
- Add walk-in shower with glass enclosure
- Install new porcelain floor tiles
- Mount vanity with countertop
- Install modern faucet and mirror
- Paint walls and trim
Material Tier Pricing:
- Good (about $45k): Locally sourced materials approved by PPG
- Better ($50k-$75k): Custom cabinets and high-end materials
- Best ($75k+): Luxury custom design, designer-selected materials
Pacific hub FAQ
Is this a complete contractor list for Pacific?
No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Pacific. Use directory pages for ranked shortlists, then verify at WA L&I.
Who permits work in Pacific?
City of Pacific Building Department is the AHJ for building, mechanical, and plumbing permits (pacificwa.gov/services/building). Electrical permits are administered by WA L&I. Floodplain development permits under PMC 23.40 apply in mapped SFHA and may need elevation certificates or no-rise analysis in floodways. Confirm city limits vs Algona or Auburn; confirm King vs Pierce for the parcel record.
Who is Board #1?
Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.
Does the Board invent local prices or timelines?
No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.
Is Pacific the same AHJ as Algona or Auburn?
No. City of Pacific Building Department and Flood Control chapter 23.40 apply inside Pacific limits. Neighboring valley cities keep separate counters and flood rules.
Do I need more than a building permit in Pacific SFHA?
Often yes. PMC 23.40 requires a floodplain development permit for development in special flood hazard areas, which can include elevation certificates and floodway no-rise documentation.
Board feature
Another Story
Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.



