Board of Project Stewardship · North Bend · East King County

North Bend remodels — South Fork Snoqualmie flood review first

North Bend requires a Floodplain Development Permit for development in the 100-year floodplain under NBMC 14.12 — in addition to building permits. Building submittal guidance notes three plan sets when a Floodplain Development Permit is required (vs two for ordinary building). This Board of Project Stewardship hub covers valley home updates and outdoor structural projects where South Fork Snoqualmie SFHA mapping often means remodel sequencing starts with flood review.

Field context · North Bend (illustrative)

North Bend residential exterior remodel context in Puget Sound
North Bend residential exterior remodel context.
Kitchen remodel interior for North Bend homeowners — Puget Sound materials
Kitchen remodel interior for North Bend homeowners — PNW materials.
Bathroom remodel scene for North Bend — waterproofing-minded Puget Sound context
Bathroom remodel scene for North Bend — waterproofing-minded PNW context.

General process video (not specific to North Bend)

Educational construction process video for North Bend planning context — not a Board project walkthrough or guarantee.

Who permits work in North Bend?

City of North Bend Building Division is the AHJ. City flood-protection information page is the public entry point for elevation certificate / flood hazard questions. Confirm whether your downtown or near-river parcel needs the Floodplain Development Permit track before kitchen demo. Do not treat North Bend as a simple Eastside lake AHJ.

Full permit jurisdiction hub · Verify contractor · Learn hub

Valley kitchens when North Bend flood review comes first

Valley-floor kitchens near the South Fork Snoqualmie often meet flood review before cabinet work. Wall moves need Building Division permits; SFHA parcels add Floodplain Development Permit requirements and extra plan sets. Educational — no invented BFE numbers.

Kitchen remodelers directory · Kitchen remodel planning

Bath remodels on North Bend SFHA-aware parcels

Waterproofing leads. Floodplain Development Permits can stack with plumbing permits on 100-year floodplain parcels. Confirm elevation certificate needs on the city’s flood-protection page before demo.

Bathroom remodelers directory · Bathroom waterproofing guide

Outdoor structural and addition work in North Bend

Outdoor structural projects and additions in the 100-year floodplain need Floodplain Development Permits alongside building permits. Sequence flood review first on downtown/near-river parcels; the Board does not invent freeboard.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for North Bend.

Official

Official portals · North Bend

Live authority-having-jurisdiction (AHJ) links for North Bend. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

North Bend hub FAQ

Is this a complete contractor list for North Bend?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for North Bend. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in North Bend?

City of North Bend Building Division is the AHJ. City flood-protection information page is the public entry point for elevation certificate / flood hazard questions. Confirm whether your downtown or near-river parcel needs the Floodplain Development Permit track before kitchen demo. Do not treat North Bend as a simple Eastside lake AHJ.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

What extra permit does North Bend require in the 100-year floodplain?

A Floodplain Development Permit under NBMC 14.12 — in addition to building permits.

How many plan sets when a Floodplain Development Permit is required?

Building submittal guidance notes three plan sets when a Floodplain Development Permit is required (vs two for ordinary building) — confirm live guidance.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story