Board of Project Stewardship · Normandy Park · South King County

Normandy Park remodels — Sound-shore waterproofing, small-city AHJ

Normandy Park is a small Sound-shore city between Burien and Des Moines — marine bluff / Puget Sound east shore exposure drives coastal waterproofing and mid-century kitchen updates. Shoreline parcels may need extra review. This Board of Project Stewardship hub covers envelope and bath diligence under City of Normandy Park permitting — not Burien or Des Moines by habit. Scout brief is thinner; lean on marine exposure + city AHJ facts.

Field context · Normandy Park (illustrative)

Normandy Park residential exterior remodel context in Puget Sound
Normandy Park residential exterior remodel context.
Kitchen remodel interior for Normandy Park homeowners — Puget Sound materials
Kitchen remodel interior for Normandy Park homeowners — PNW materials.
Home addition / exterior massing for Normandy Park — Puget Sound cedar-fir context
Home addition / exterior massing for Normandy Park — PNW cedar-fir context.

General process video (not specific to Normandy Park)

Educational construction process video for Normandy Park planning context — not a Board project walkthrough or guarantee.

Who permits work in Normandy Park?

City of Normandy Park permitting is the AHJ. Shoreline parcels may need extra review beyond ordinary building permits. Confirm city limits vs Burien/Des Moines neighbors. Prefer normandyparkwa.gov live contacts for portal path.

Full permit jurisdiction hub · Verify contractor · Learn hub

Mid-century kitchens on Normandy Park’s Sound-shore streets

Normandy Park’s Sound-shore mid-century kitchens sit between Burien and Des Moines but answer only to Normandy Park’s counter. Marine bluff weather drives exterior transitions even when the work triangle stays inland of OHWM. Board notes here cover layout diligence — not a catalog of fixture prices.

Kitchen remodelers directory · Kitchen remodel planning

Coastal bath waterproofing in Normandy Park

Wet-area waterproofing is the longevity driver on Sound-adjacent lots. Shoreline parcels may need extra review with plumbing permits. Gut vs refresh stays scope — confirm Normandy Park AHJ early.

Bathroom remodelers directory · Bathroom waterproofing guide

Shoreline-aware additions in Normandy Park

Envelope and bath diligence plus shoreline-aware additions meet Puget Sound east-shore constraints Burien marine miles and Des Moines marina vicinity administer separately. Sequence Normandy Park shoreline/building review before pricing a bump-out.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Normandy Park.

Official

Official portals · Normandy Park

Live authority-having-jurisdiction (AHJ) links for Normandy Park. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Normandy Park hub FAQ

Is this a complete contractor list for Normandy Park?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Normandy Park. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Normandy Park?

City of Normandy Park permitting is the AHJ. Shoreline parcels may need extra review beyond ordinary building permits. Confirm city limits vs Burien/Des Moines neighbors. Prefer normandyparkwa.gov live contacts for portal path.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Normandy Park the same AHJ as Burien or Des Moines?

No. Normandy Park is its own small Sound-shore city — do not file under Burien or Des Moines by habit.

What drives Normandy Park remodel detailing?

Puget Sound east-shore / marine bluff exposure — coastal waterproofing and shoreline review on mapped parcels.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story