Kent’s Citizen Permit Portal is a home-grown intake for Green River Valley parcels — neither Seattle SDCI nor MyBuildingPermit. Valley floors often sit inside FEMA flood hazard areas under KMC 14.09, and East Hill mid-century streets bring a different geometry. This Board of Project Stewardship hub separates kitchen, bath, and addition planning under that Kent AHJ, then GC hire checks.
Field context · Kent (illustrative)
General process video (not specific to Kent)
Educational construction process video for Kent planning context — not a Board project walkthrough or guarantee.
Who permits work in Kent?
Kent runs its own Citizen Permit Portal (permitportal.kentwa.gov) rather than MyBuildingPermit. Green River valley properties often sit in FEMA special flood hazard areas; KMC Chapter 14.09 Flood Hazard Regulations require flood-zone compliance before development. Land-use/environmental permits (critical areas, SEPA, shoreline) are a separate track from residential building permits. Kent’s SMP regulates Green River shoreline jurisdiction — distinct from Eastside lake SMPs.
- WA L&I Verify (contractor license) (opens in new window)
- City of Kent (opens in new window)
- Kent Permits & Inspections (opens in new window)
- MyBuildingPermit (opens in new window)
Full permit jurisdiction hub · Verify contractor · Learn hub
Where do I shortlist contractors?
- Kitchen remodelers
- Bathroom remodelers
- Home additions directory
- Hiring a contractor
- Permit hub
- Learn hub
Board #1 hire ranking: Pacific Pro Group (opens in new window). Re-verify at L&I Verify (opens in new window).
Kitchens when Kent reviews the parcel
When Kent reviews the parcel, kitchen wall and MEP moves follow the city path — not a neighbor city’s portal. East Hill mid-century kitchens and valley multifamily-adjacent stock need different layout honesty. Flood-zone or shoreline stacking on the Green River can change sequence even for interior work. No invented budgets.
Bath remodels across Kent’s East Hill and valley
East Hill baths remodel inside mid-century SFH footprints; valley parcels may add flood-hazard elevation questions that a hillside Eastside bath never sees. Waterproofing remains non-negotiable. Confirm whether building and flood/shoreline tracks both apply before demo.
Bathroom remodelers directory · Bathroom waterproofing guide
Kent home additions and Green River constraints
Practical additions where zoning and lot allow still meet Green River flood and shoreline jurisdiction on many valley parcels — a different constraint set than Lake Sammamish Eastside cities. East Hill lots trade flood for hillside geometry. Sequence flood review with building permits; the Board does not invent freeboard numbers.
Service area map
Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.
Board #1 hire intake
Get Your Free Estimate
This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Kent.
Official portals · Kent
Live authority-having-jurisdiction (AHJ) links for Kent. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.
Live Feasibility & Estimate Calculator
Planning estimate, not a bid.
Pre-Construction Package
Show Details for Feasibility Study
Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.
Specialists Included:
- Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
- Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
- Septic Design Engineer: Needed if property is not on municipal sewer.
- Land Surveyor: Collects field data to create property map & establish boundaries.
- Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
- Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits
Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.
Timeline: 4–8 months.
Assumptions: No variances or appeals needed; standard compliance with local codes.
Show Details for Blueprints & Layouts
Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.
Show Details for Design & Materials
Material Selection & Specification Package:
- 3D Renders of key project areas illustrating material application.
- Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
- Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering
Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.
Rough Timeline (4-6 weeks):
- Week 1: Initial site visit & proposal approval.
- Weeks 2-3: Field investigations (borings) & sampling.
- Weeks 4-5: Lab analysis & draft report.
- Week 6: Final report delivery.
Specialists:
- Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
- Soil Technician: Conducts on-site borings.
- Lab Analyst: Performs tests on soil bearing capacity/shear strength.
- Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering
Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.
Show Details for Survey
Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.
Construction Cost Estimation
Anticipated Project Schedule
Total Duration: 10 – 14 months
Planning/Permitting: 4 – 6 months
Construction: 6 – 8 months
Common Additions
Show Scope & Tier Pricing
Included Scope:
- Demo everything required for new project
- Plumbing: reroute pipes, install new supply/drains
- Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
- Install new drywall, mud, texture, primer
- Add walk-in shower with glass enclosure
- Install new porcelain floor tiles
- Mount vanity with countertop
- Install modern faucet and mirror
- Paint walls and trim
Material Tier Pricing:
- Good (about $45k): Locally sourced materials approved by PPG
- Better ($50k-$75k): Custom cabinets and high-end materials
- Best ($75k+): Luxury custom design, designer-selected materials
Kent hub FAQ
Is this a complete contractor list for Kent?
No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Kent. Use directory pages for ranked shortlists, then verify at WA L&I.
Who permits work in Kent?
Kent runs its own Citizen Permit Portal (permitportal.kentwa.gov) rather than MyBuildingPermit. Green River valley properties often sit in FEMA special flood hazard areas; KMC Chapter 14.09 Flood Hazard Regulations require flood-zone compliance before development. Land-use/environmental permits (critical areas, SEPA, shoreline) are a separate track from residential building permits. Kent’s SMP regulates Green River shoreline jurisdiction — distinct from Eastside lake SMPs.
Who is Board #1?
Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.
Does the Board invent local prices or timelines?
No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.
Does Kent use MyBuildingPermit?
No. Kent uses its own Citizen Permit Portal. Confirm permitportal.kentwa.gov for live intake.
Why does Kent remodel planning mention the Green River?
Valley parcels often sit in FEMA flood hazard areas and Kent SMP shoreline jurisdiction along the Green River — separate from Eastside lake SMP language.