Board of Project Stewardship · Des Moines · South King County

Des Moines remodels — East Passage marine climate, city dual tracks

Des Moines SMP covers Puget Sound marine shoreline — including the marina vicinity — generally 200 ft landward of OHWM. Bluff and marine lots typically need both Building Division worksheets and planning shoreline/land-use worksheets. This Board of Project Stewardship hub frames marine-climate envelope kitchens and baths plus shoreline-aware additions under City of Des Moines review.

Field context · Des Moines (illustrative)

Des Moines residential exterior remodel context in Puget Sound
Des Moines residential exterior remodel context.
Kitchen remodel interior for Des Moines homeowners — Puget Sound materials
Kitchen remodel interior for Des Moines homeowners — PNW materials.
Home addition / exterior massing for Des Moines — Puget Sound cedar-fir context
Home addition / exterior massing for Des Moines — PNW cedar-fir context.

General process video (not specific to Des Moines)

Educational construction process video for Des Moines planning context — not a Board project walkthrough or guarantee.

Who permits work in Des Moines?

City of Des Moines Planning and Building is the AHJ. Building Division permit applications are separate from planning shoreline/land-use worksheets — remodelers on bluff/marine lots typically need both tracks. City publishes a dedicated Shoreline Master Program PDF for local marine jurisdiction. Permit Center contact is published for package questions — confirm the live phone/email on city pages.

Full permit jurisdiction hub · Verify contractor · Learn hub

Kitchens on Des Moines’ Marine View Drive corridor

Along Marine View Drive and marina-adjacent streets, mid-century kitchens face salt-air envelope stress Seattle inland ridges rarely see. Open a wall and Des Moines Building Division worksheets apply; bluff lots usually add planning shoreline packets on top. This Board section stays educational — layout honesty without invented appliance budgets.

Kitchen remodelers directory · Kitchen remodel planning

Bath waterproofing on Des Moines Soundfront parcels

Marine exposure raises waterproofing stakes for baths — especially on bluff lots. Gut vs refresh is scope; plumbing moves follow building review. Shoreline jurisdiction can stack a second track even when the wet room itself looks interior.

Bathroom remodelers directory · Bathroom waterproofing guide

Shoreline-aware additions in Des Moines

Additions with shoreline awareness on East Passage lots meet marine SMP buffers that lake cities do not share. Inland streets still face coastal detailing habits. Sequence Building Division and planning shoreline worksheets before pricing a bump-out.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Des Moines.

Official

Official portals · Des Moines

Live authority-having-jurisdiction (AHJ) links for Des Moines. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Des Moines hub FAQ

Is this a complete contractor list for Des Moines?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Des Moines. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Des Moines?

City of Des Moines Planning and Building is the AHJ. Building Division permit applications are separate from planning shoreline/land-use worksheets — remodelers on bluff/marine lots typically need both tracks. City publishes a dedicated Shoreline Master Program PDF for local marine jurisdiction. Permit Center contact is published for package questions — confirm the live phone/email on city pages.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Does Des Moines regulate lake shoreline?

No. Des Moines SMP covers Puget Sound marine shoreline, including marina vicinity — generally 200 ft landward of OHWM.

Are building and shoreline the same Des Moines worksheet?

No. Building Division applications are separate from planning shoreline/land-use worksheets; bluff/marine lots typically need both.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story