Board of Project Stewardship · Clyde Hill · Eastside · King County

Clyde Hill remodels — original-grade height, hillside zoning first

Clyde Hill is a small Eastside residential city between Bellevue and Medina where view-sensitive hillside zoning and a hard 25-foot height limit measured above the city’s original-grade determination control what an addition can do. Permits run through the city’s Building Department and Citizen’s Connect Permit Portal — not Bellevue’s counter. This Board of Project Stewardship hub frames kitchen, bath, and addition questions around that envelope and Hearing Examiner variance path — educational only.

Field context · Clyde Hill (illustrative)

Clyde Hill residential exterior remodel context in Puget Sound
Clyde Hill residential exterior remodel context.
Kitchen remodel interior for Clyde Hill homeowners — Puget Sound materials
Kitchen remodel interior for Clyde Hill homeowners — PNW materials.
Home addition / exterior massing for Clyde Hill — Puget Sound cedar-fir context
Home addition / exterior massing for Clyde Hill — PNW cedar-fir context.

General process video (not specific to Clyde Hill)

Educational construction process video for Clyde Hill planning context — not a Board project walkthrough or guarantee.

Who permits work in Clyde Hill?

City of Clyde Hill Building Department reviews building, mechanical, storm drainage, demolition, grading, and right-of-way permits via Citizen’s Connect (clydehill.org). Over-the-counter paths exist for re-roofs and window/door replacements. No structure may exceed 25 feet above original grade as determined by the city. Variances require a pre-application meeting and Hearing Examiner hearing under CHMC 17.72. Confirm Clyde Hill city limits vs Bellevue or Medina.

Full permit jurisdiction hub · Verify contractor · Learn hub

Kitchen remodels inside Clyde Hill’s height and setback box

Larger mid-century and custom kitchens on Clyde Hill’s hillside lots still answer only to the city’s Building Department. Layout moves that change roof form or massing trip the 25-foot original-grade rule even when the wet work looks routine. Confirm Citizen’s Connect intake — not Bellevue MyBuildingPermit — before cabinet deposits.

Kitchen remodelers directory · Kitchen remodel planning

Bath updates on Clyde Hill’s view-sensitive hillside lots

Waterproofing leads. Plumbing and mechanical permits are city-issued; electrical and some utility connections may route to other agencies per city FAQ. Topography that justifies a variance for setbacks can also shape bath expansions — schedule the pre-application meeting early.

Bathroom remodelers directory · Bathroom waterproofing guide

Clyde Hill additions when original grade caps the envelope

Ground bump-outs and second stories both meet Clyde Hill’s original-grade height cap, lot coverage, and setback matrix. Steep topography often drives Hearing Examiner variance requests — treat that as scoped diligence with a licensed GC, not a Board promise that every hillside lot yields a second story.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Clyde Hill.

Official

Official portals · Clyde Hill

Live authority-having-jurisdiction (AHJ) links for Clyde Hill. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Clyde Hill hub FAQ

Is this a complete contractor list for Clyde Hill?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Clyde Hill. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Clyde Hill?

City of Clyde Hill Building Department reviews building, mechanical, storm drainage, demolition, grading, and right-of-way permits via Citizen’s Connect (clydehill.org). Over-the-counter paths exist for re-roofs and window/door replacements. No structure may exceed 25 feet above original grade as determined by the city. Variances require a pre-application meeting and Hearing Examiner hearing under CHMC 17.72. Confirm Clyde Hill city limits vs Bellevue or Medina.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Clyde Hill the same AHJ as Bellevue or Medina?

No. Clyde Hill is its own city Building Department with Citizen’s Connect permitting. Neighboring Points and Eastside cities keep separate counters.

What is the Clyde Hill height limit remodelers must know?

City guidance states no structure may be higher than 25 feet above the original grade of the property as determined by the city — including all parts of a structure. Confirm the live Residential Zoning Rules PDF before design freeze.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story