Board of Project Stewardship · Burien · South King County

Burien remodels — Highline dual shorelines, mid-century updates

Burien SMP applies to roughly five miles of Puget Sound marine shoreline plus Lake Burien, including waters and areas 200 ft landward of OHWM — a dual marine + freshwater setting Eastside single-lake AHJs do not share. This Board of Project Stewardship hub covers coastal-adjacent weatherproofing and mid-century kitchen updates under City of Burien Permit Center review — airport proximity is geography, not a Board noise score.

Field context · Burien (illustrative)

Burien residential exterior remodel context
Burien residential exterior remodel context.
Kitchen remodel interior for Burien homeowners — PNW materials
Kitchen remodel interior for Burien homeowners — PNW materials.
Bathroom remodel scene for Burien — waterproofing-minded PNW context
Bathroom remodel scene for Burien — waterproofing-minded PNW context.

General process video (not specific to Burien)

Educational construction process video for Burien planning context — not a Board project walkthrough or guarantee.

Who permits work in Burien?

City of Burien Permit Center / Planning Division processes shoreline permits under BMC Title 20. Periodic review amendments became effective May 9, 2019 after Ecology approval. Planning Division phone is published for shoreline property-owner guidance — confirm live contact on the SMP page. Confirm residential portal path for ordinary building permits.

Full permit jurisdiction hub · Verify contractor · Learn hub

Mid-century kitchen updates in Burien’s Highline fabric

Highline mid-century kitchens remodel under Burien’s city path. Weatherproofing transitions matter on coastal-adjacent streets; wall moves need Permit Center review. Lake Burien shoreline parcels add freshwater SMP questions that marine-only lots skip. Educational — no invented remodel costs.

Kitchen remodelers directory · Kitchen remodel planning

Bath weatherproofing near Burien’s Sound and Lake Burien

Wet-area waterproofing leads on both marine and Lake Burien parcels. Mid-century stock often needs ventilation upgrades. Shoreline jurisdiction within 200 ft of OHWM can attach even when the bath feels inland.

Bathroom remodelers directory · Bathroom waterproofing guide

Additions where Burien lots and overlays allow

Additions where lot and overlays allow still meet dual shoreline environments on some parcels — marine Sound frontage vs Lake Burien. Inland Highline lots trade shoreline for ordinary setbacks. Confirm Permit Center path before treating a bump-out as building-only.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Burien.

Official

Official portals · Burien

Live authority-having-jurisdiction (AHJ) links for Burien. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Burien hub FAQ

Is this a complete contractor list for Burien?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Burien. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Burien?

City of Burien Permit Center / Planning Division processes shoreline permits under BMC Title 20. Periodic review amendments became effective May 9, 2019 after Ecology approval. Planning Division phone is published for shoreline property-owner guidance — confirm live contact on the SMP page. Confirm residential portal path for ordinary building permits.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

What shorelines does Burien’s SMP cover?

Roughly five miles of Puget Sound marine shoreline plus Lake Burien, including waters and areas 200 ft landward of OHWM.

Is airport proximity a Burien permit score?

Airport proximity is geography. The Board does not invent noise scores — confirm overlays with Burien’s Permit Center for your parcel.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story