Board of Project Stewardship · Black Diamond · Southeast King County

Black Diamond remodels — lake country plats, not Maple Valley’s counter

Black Diamond is a SE King foothills city with a historic coal-mining townsite plus newer master-planned residential areas — mine-hazard / critical-areas language and master-plan design standards are the distinctive AHJ themes. This Board of Project Stewardship hub covers kitchen/bath and additions where HOA/city and lot allow under City of Black Diamond permitting — not Maple Valley’s counter. Confirm growth-area design standards separately from ordinary building permits.

Field context · Black Diamond (illustrative)

Black Diamond residential exterior remodel context in Puget Sound
Black Diamond residential exterior remodel context.
Kitchen remodel interior for Black Diamond homeowners — Puget Sound materials
Kitchen remodel interior for Black Diamond homeowners — PNW materials.
Home addition / exterior massing for Black Diamond — Puget Sound cedar-fir context
Home addition / exterior massing for Black Diamond — PNW cedar-fir context.

General process video (not specific to Black Diamond)

Educational construction process video for Black Diamond planning context — not a Board project walkthrough or guarantee.

Who permits work in Black Diamond?

City of Black Diamond permitting is the AHJ. Growth areas may have master-plan design standards beyond base zoning. Prefer blackdiamondwa.gov live permit contacts. Parcel-level mine/critical-areas screening should use city/county maps before FAQ claims.

Full permit jurisdiction hub · Verify contractor · Learn hub

Kitchens in Black Diamond’s townsite and newer plats

Older townsite and newer master-planned kitchens remodel under Black Diamond’s city path. Wall moves need city review; growth-area design standards can add elevation/material expectations HOA-adjacent plats do not skip. Educational only.

Kitchen remodelers directory · Kitchen remodel planning

Bath remodels across Black Diamond’s dual housing eras

Waterproofing leads in both townsite and master-planned stock. Mine-hazard / critical-areas screening can accompany plumbing permits when mapped. Confirm Black Diamond AHJ — not Maple Valley.

Bathroom remodelers directory · Bathroom waterproofing guide

Additions in expanding Black Diamond residential plats

Remodel work in expanding residential plats still meets HOA/city design standards and critical-areas screening. Sequence master-plan rules with building permits; the Board does not invent plat setbacks.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Black Diamond.

Official

Official portals · Black Diamond

Live authority-having-jurisdiction (AHJ) links for Black Diamond. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Black Diamond hub FAQ

Is this a complete contractor list for Black Diamond?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Black Diamond. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Black Diamond?

City of Black Diamond permitting is the AHJ. Growth areas may have master-plan design standards beyond base zoning. Prefer blackdiamondwa.gov live permit contacts. Parcel-level mine/critical-areas screening should use city/county maps before FAQ claims.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Black Diamond permitted through Maple Valley?

No. City of Black Diamond permitting is the AHJ — not Maple Valley’s counter.

Why mention master-planned design standards?

Growth areas may have master-plan design standards beyond base zoning — confirm separately from ordinary building permits.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story