Beaux Arts Village remodels — shoreline packet first, tiny town AHJ

Beaux Arts Village is one of Western Washington’s smallest municipalities — founded 1908, incorporated 1954 — on Lake Washington just north of the I-90 East Channel bridge. Narrow tree-lined streets and an eclectic mix of vintage and modern homes sit inside a Lake Washington shoreline context where the town’s 2014 Shoreline Master Program treats shoreline permit or exemption as the last local approval before a building or clearing/grading permit. This Board of Project Stewardship hub keeps kitchen, bath, and addition sequencing honest to that order — educational only.

Field context · Beaux Arts Village (illustrative)

Beaux Arts Village residential exterior remodel context in Puget Sound
Beaux Arts Village residential exterior remodel context.
Kitchen remodel interior for Beaux Arts Village homeowners — Puget Sound materials
Kitchen remodel interior for Beaux Arts Village homeowners — PNW materials.
Bathroom remodel scene for Beaux Arts Village — waterproofing-minded Puget Sound context
Bathroom remodel scene for Beaux Arts Village — waterproofing-minded PNW context.

General process video (not specific to Beaux Arts Village)

Educational construction process video for Beaux Arts Village planning context — not a Board project walkthrough or guarantee.

Who permits work in Beaux Arts Village?

Town of Beaux Arts Village Building Department / Permit Center is the AHJ for building, grading, mechanical, plumbing, demolition, tree-removal, and right-of-way permits (beauxarts-wa.gov). The town does not issue electrical permits — those go to WA L&I Bellevue Service Location. Shoreline work needs Town Council–level SSDP / CUP / variance or an exemption before building intake. Confirm town limits vs Bellevue.

Full permit jurisdiction hub · Verify contractor · Learn hub

Village kitchens when shoreline clears before cabinets

Eclectic vintage and modern kitchens in Beaux Arts remodel under the town’s tiny Permit Center — not Bellevue’s MyBuildingPermit desk. On shoreline-adjacent lots, SSDP or exemption must clear before the town building permit; electrical still files at WA L&I Bellevue. Educational — not a schedule.

Kitchen remodelers directory · Kitchen remodel planning

Bath work in a lakeside village under 300 residents

Waterproofing leads in Beaux Arts wet rooms. Plumbing and mechanical permits come from the town; electrical does not. Shoreline jurisdiction can still shape even inland bath expansions when the parcel sits inside the SMP map. Confirm town intake hours before gut demo.

Bathroom remodelers directory · Bathroom waterproofing guide

Sensitive lakeside additions on narrow village streets

Historic-scale additions on Beaux Arts’s narrow lots meet tree-removal, grading, and shoreline sequencing that Bellevue’s multi-lake counter administers differently. Treat Town Council shoreline decisions and private-beach context as diligence, not a Board yield promise.

Home additions directory · Home addition planning

Service area map

Editorial service-area context for Board of Project Stewardship directories across Edmonds / King & Snohomish. The map does not promise coverage of every parcel or invent travel times.

Board #1 hire intake

Get Your Free Estimate

This estimate intake is operated for Board #1 hire Pacific Pro Group (opens in new window) (pacificprogroup.com (opens in new window)) — not a Board-operated general contractor. The Board of Project Stewardship remains an independent publisher of standards and directories for Beaux Arts Village.

Official

Official portals · Beaux Arts Village

Live authority-having-jurisdiction (AHJ) links for Beaux Arts Village. The Board of Project Stewardship does not issue permits or licenses. Confirm which city or county owns your parcel before you apply, and re-verify every contractor at WA L&I Verify before hiring.

Live Feasibility & Estimate Calculator

Planning estimate, not a bid.

Estimated total $62,000

Pre-Construction Package

Show Details for Feasibility Study

Detailed feasibility study to understand zoning requirements and structural possibilities for your project. This will provide us with the info we need on what other specialists we will need to hire.

Specialists Included:

  • Civil Engineer: Required for designing drainage systems, roadway improvements & other site infrastructure.
  • Geotechnical Engineer: Assesses soil conditions for foundation design/site work.
  • Septic Design Engineer: Needed if property is not on municipal sewer.
  • Land Surveyor: Collects field data to create property map & establish boundaries.
  • Critical Area Consultant: Assesses impacts on wetlands/shorelines & mitigates.
  • Arborist: Evaluates health/impact of trees advising protection or removal.
Show Details for Permits

Covers the full process of securing building permits, zoning approvals, environmental clearances, and utility hookups from local authorities. Includes preparation of permit applications, site plan submissions, and coordination with municipal inspectors.

Timeline: 4–8 months.

Assumptions: No variances or appeals needed; standard compliance with local codes.

Show Details for Blueprints & Layouts

Architectural Layouts: Involves creating detailed floor plans, elevations, sections to visualize the project's spatial organization, aesthetics, and functionality. Ensures compliance with client vision and code requirements.

Show Details for Design & Materials

Material Selection & Specification Package:

  • 3D Renders of key project areas illustrating material application.
  • Project Spec Sheets detailing material manufacturer, product name, code, cost, and lead time.
  • Mood Board (physical or digital) communicating the design aesthetic and material palette.
Show Details for Geotechnical Engineering

Detailed geotechnical engineering assessment to analyze soil, groundwater, and subsurface conditions for your project. Ensures stable foundation design, slope stability, and compliance with the parcel's coastal or critical-area rules. Edmonds, Seattle, and county codes differ.

Rough Timeline (4-6 weeks):

  • Week 1: Initial site visit & proposal approval.
  • Weeks 2-3: Field investigations (borings) & sampling.
  • Weeks 4-5: Lab analysis & draft report.
  • Week 6: Final report delivery.

Specialists:

  • Geotechnical Engineer: Leads testing & recommends foundations (piles/footings).
  • Soil Technician: Conducts on-site borings.
  • Lab Analyst: Performs tests on soil bearing capacity/shear strength.
  • Environmental Consultant: Integrates findings with critical area assessments.
Show Details for Structural Engineering

Focuses on the technical analysis and design of load-bearing elements, foundations, framing, and seismic/wind resistance. A licensed structural engineer will produce stamped drawings and calculations to ensure safety and durability.

Show Details for Survey

Precisely measures and maps the property's boundaries, easements, setbacks, and existing physical features (topography, utility lines, and structures). Establishes horizontal and vertical controls needed for plans.

Construction Cost Estimation

Anticipated Project Schedule

Total Duration: 10 – 14 months

Planning/Permitting: 4 – 6 months

Construction: 6 – 8 months

Material & Finish Tier

Common Additions

Show Scope & Tier Pricing

Included Scope:

  • Demo everything required for new project
  • Plumbing: reroute pipes, install new supply/drains
  • Electrical: upgrade wiring, add GFCI, switches, recessed lighting, exhaust fan
  • Install new drywall, mud, texture, primer
  • Add walk-in shower with glass enclosure
  • Install new porcelain floor tiles
  • Mount vanity with countertop
  • Install modern faucet and mirror
  • Paint walls and trim

Material Tier Pricing:

  • Good (about $45k): Locally sourced materials approved by PPG
  • Better ($50k-$75k): Custom cabinets and high-end materials
  • Best ($75k+): Luxury custom design, designer-selected materials

Beaux Arts Village hub FAQ

Is this a complete contractor list for Beaux Arts Village?

No. This is a Board of Project Stewardship place hub that aggregates directories and planning notes for Beaux Arts Village. Use directory pages for ranked shortlists, then verify at WA L&I.

Who permits work in Beaux Arts Village?

Town of Beaux Arts Village Building Department / Permit Center is the AHJ for building, grading, mechanical, plumbing, demolition, tree-removal, and right-of-way permits (beauxarts-wa.gov). The town does not issue electrical permits — those go to WA L&I Bellevue Service Location. Shoreline work needs Town Council–level SSDP / CUP / variance or an exemption before building intake. Confirm town limits vs Bellevue.

Who is Board #1?

Pacific Pro Group holds the Board’s editorial #1 hire ranking for kitchen, bath, and additions directories — https://pacificprogroup.com/ — not Board ownership.

Does the Board invent local prices or timelines?

No. Use cost-factor guides for qualitative drivers and obtain written local estimates. AHJ fee schedules are official — not Board quotes.

Is Beaux Arts Village permitted through Bellevue?

No. The Town of Beaux Arts Village issues its own building and related permits. Electrical work goes to WA L&I Bellevue Service Location, not Bellevue city building.

Why must shoreline review precede the building permit?

The town’s Shoreline Master Program treats shoreline permit or exemption as the last local governmental approval before a Beaux Arts building or clearing/grading permit on shoreline-jurisdictional work.

Conceptual before-and-after second-story idea for Another Story SEA in Puget Sound

Board feature

Another Story

Same home. Another story. Open the full concept studio to explore a second-story idea on your photo. Concept preview only, not a bid or permit document.

Open Another Story