Phase: 1. Pre-Con

📋 Project Master File

Phase 1: Pre-Construction & Handoff

Review all estimating documents, establish site controls, and prepare for mobilization.

Reviewed signed contract, final plans, geotech/structural engineering, and specific client requests.
0%
Building, plumbing, electrical, and mechanical permits are approved and physically posted on-site in a weather-proof box.
0%
Documented existing conditions of the house, driveway, and neighboring property lines to protect against liability.
0%
Client has signed off on all preliminary material selections (siding colors, window types, etc.) before final ordering.
0%
Stormwater Pollution Prevention Plan reviewed. Erosion control measures scheduled for installation prior to digging.
0%
Port-a-john delivered, dumpster/debris plan established, temp power and water confirmed.
0%
Surveyor pins located. Setbacks physically marked to ensure foundation avoids encroachment.
0%
Tarping, shrink wrap, or temporary roof structures staged to protect the existing home during demo/tie-in.
0%
Adjacent properties notified of upcoming construction timeline, noise, and PM contact info.
0%
Right of Way (ROW) permits secured for dumpsters, cranes, or material deliveries. Traffic control plan coordinated if blocking streets.
0%
Temporary chain-link fencing installed. Jobsite locks, lockboxes, and any required security cameras active.
0%
Met with client on-site. Discussed working hours, parking, dust mitigation, safety rules, and communication expectations.
0%

Phase 2: Site Prep & Groundwork

Clearing, excavation, foundation pouring, and underground utilities.

Silt fences/wattles installed. Existing structures/hardscaping demolished and hauled away. Tree protection in place.
0%
Footings dug to plan depth. Trenches cut for underground utilities.
0%
All excess spoils loaded and hauled off-site. Dump truck tickets logged to budget.
0%
Geotechnical engineer inspected open trenches and verified soil bearing capacity matches plans.
0%
Under-slab drainage, sewer connections, and electrical conduits laid and inspected prior to pour.
0%
Underslab vapor barrier installed and taped. Rigid foam insulation laid down per energy code.
0%
Foundation forms built. Steel reinforcement (rebar) tied per structural plans. Ufer ground established. Footing inspection passed.
0%
Surveyor verified forms are perfectly placed within setbacks before concrete truck arrives.
0%
Concrete poured and finished. Anchor bolts and hold-downs wet-set precisely per structural layout.
0%
All concrete forms stripped and removed from site. Concrete splatter/debris cleaned up to prepare for framers.
0%
Foundation coating/waterproofing applied. Perimeter drain (French drain) installed. Foundation backfilled and compacted.
0%

Phase 3: Framing & Dry-In

Going vertical. Floor systems, walls, roof structure, and weather-proofing.

Windows, custom exterior doors, roof trusses, and specialized structural steel ordered.
0%
Framing package delivered. Treated sill plates installed with sill sealer.
0%
Floor joists/I-joists installed. Subfloor glued, nailed, and joints sanded flush.
0%
Exterior and interior walls framed, plumbed, and lined. Exterior wall sheathing (OSB/plywood) installed and nailed to sheer code.
0%
All framed walls laser-checked for perfectly plumb vertical alignment before roof loading.
0%
Roof trusses or stick-framed rafters installed. Fascia boards and roof decking attached.
0%
Stair stringers cut and installed. Temporary construction treads attached for safe floor-to-floor access.
0%
Flitch plates, structural steel posts, or glulam beams bolted and welded securely in place.
0%
All Simpson ties, straps, and hold-downs installed to structural engineer's exact specification.
0%
City inspector has signed off on the complete framing and structural package.
0%
Chimney crickets framed. Step and kick-out flashing installed at roof-to-wall intersections.
0%
Weather-resistant barrier (Tyvek/Zip) installed. Roof underlayment/synthetic felt applied.
0%
Windows and exterior doors set, squared, shimmed, and flashed (taped) to prevent water intrusion. Structure is officially dried-in.
0%
Wood blocking installed behind drywall for future cabinets, towel bars, grab bars, heavy mirrors, TVs, and window treatments.
0%

Phase 4: MEP Rough-Ins

Mechanical, Electrical, and Plumbing systems installed within the wall cavities.

Ductwork, vents, exhaust fans, and furnace/air handler units installed. Refrigerant lines run.
0%
Water supply lines (PEX/Copper), drain-waste-vent (DWV) piping installed. Shower pans sloped/lined.
0%
Gas lines run to appliances and successfully passed pressure test without leaks.
0%
Main panel set. Wires pulled to all switch, outlet, and fixture boxes. Data, coax, and AV cables run.
0%
Low-voltage wiring pulled for security cameras, motorized shades, built-in audio, and smart thermostats.
0%
In-floor heating mats laid and tested. Central vac lines routed (if applicable).
0%
Sprinkler pipes and drops installed and pressure tested. (If required by code)
0%
All penetrations between floors and into the attic are sealed with fire foam/caulk to code.
0%
Verify backing/blocking is installed for cabinets, towel bars, TVs, and grab bars. Verify all MEP placements match client plans.
0%
City has passed HVAC, Plumbing, and Electrical rough-in inspections. Clear to insulate.
0%

Phase 5: Exterior Finishes

Completing the building envelope, siding, roofing, and exterior aesthetic.

Shingles, metal, or flat roof membranes fully installed with all flashing, vents, and ridge caps.
0%
Z-flashing, pan flashing, and head flashing installed correctly before siding covers them up.
0%
Siding (Hardie, cedar, stucco, etc.) installed. Window trims, corner boards, and soffit/fascia completed.
0%
Soffit panels installed and continuous venting clears insulation baffles.
0%
Stone, brick, or masonry accents applied to foundation skirts or exterior walls.
0%
All exterior joints caulked. Primer and final paint coats applied to siding and trim.
0%
Overhead garage doors installed, tracked, balanced, and motorized.
0%
Seamless gutters formed and hung. Downspouts tied into underground drainage system.
0%
Sconces, security lights, and weatherproof GFCI outlets installed.
0%
Deck boards installed. Yard graded to push water away from the foundation.
0%

Phase 6: Insulation & Drywall

Sealing the thermal envelope and enclosing the interior walls.

Swept and vacuumed all sawdust and debris from base plates before insulation/drywall seals the cavity.
0%
Wall and ceiling thermal insulation installed (batts, spray foam, blown-in). Baffles installed in attic.
0%
Acoustic insulation installed in interior walls (bathrooms, laundry, master beds) to reduce noise.
0%
City has passed thermal envelope inspection. Clear to hang drywall.
0%
Sheetrock safely boomed in through windows and distributed across floors without damaging framing.
0%
Sheetrock hung on walls/ceilings. City drywall screw/fastener inspection passed (if required).
0%
Seams taped, mudded (3 coats typical), corner beads installed, and sanded smooth.
0%
All heavy sheetrock off-cuts removed from floors and dumped to keep the site safe for trim carpenters.
0%
Wall texture applied (if applicable). PVA primer coat sprayed/rolled on all raw drywall.
0%
Third-party blower door and duct leakage testing completed to comply with strict WA State Energy Code.
0%

Phase 7: Interior Finishes & Millwork

Installing hard surfaces, carpentry, and turning the structure into a home.

Interior doors hung. Window casings, baseboards, crown molding, and wainscoting installed.
0%
Finish treads, risers, handrails, newel posts, and balusters permanently installed.
0%
Ceilings, walls, and millwork painted to client spec.
0%
Kitchen/bath cabinetry installed and leveled. Pulls, knobs, and soft-close hardware attached.
0%
All doors and drawers fine-tuned to ensure even gaps (reveals) and smooth operation.
0%
Stone/quartz templated, fabricated, and installed. Sinks under-mounted.
0%
Shower pans, wall tiles, niches, and kitchen backsplash set and grouted.
0%
Hard surface flooring installed. If site-finished wood, final polyurethane coats applied. Floors covered/protected with Ram Board.
0%
Wire or custom wood shelving installed in pantries, mudrooms, and bedroom closets.
0%
Frameless shower enclosures installed. Vanity mirrors hung.
0%
Toilets, faucets, lights, switches, cover plates, HVAC registers, and final thermostats installed.
0%
Oven, fridge, dishwasher, etc. set in place, connected to power/water, and tested.
0%

Phase 8: Punch, Final & Handover

Quality control, final inspections, and delivering the finished product to the client.

Certificate of Occupancy (or final sign-off) issued by the city.
0%
Airflow tested and balanced. Thermostats programmed and verified.
0%
Driveways poured, sod laid, and final yard grading/plantings completed.
0%
Verified dirt slopes away from foundation 6" over the first 10'. Downspouts routing water clear of the structure.
0%
PM walked the site. All paint touch-ups, missing hardware, and minor defects resolved.
0%
Dumpster pulled. Temp toilet removed. Professional cleaners deep-cleaned the entire project area.
0%
All factory stickers removed from glass. Windows professionally washed inside and out.
0%
Walked project with client. Final client punch-list items noted (if any) or project formally accepted.
0%
Trained client on HVAC thermostats, smart home features, water shutoffs, and electrical panel layout.
0%
All specific items noted by the client during the walkthrough have been fixed.
0%
All field redlines translated to final As-Built drawings. Digital copies provided to client and saved in CRM.
0%
Final payment collected. Keys, manuals, and warranty documentation given to client. Project closed.
0%

📄 Generate PM Status Report

Compile all tracked progress and phase notes into a clean PDF for the office or client.

Team status note — overall progress

Team note for internal status only — not a contractual schedule or payment milestone.

%
Auto-syncs with checklist, or type/click below to override.
Quick Milestones:
🖨

Ready to Export

This will generate a formatted document containing the Project Master File details, completion status of all 8 phases, your written notes, and the visual progress bar below everything.